Schulenberg v. Harriman, 88 U.S. 21 Wall. 44 44 (1874)Schulenberg v. Harriman
88 U.S. (21 Wall.) 44
Syllabus
1. On the 3d of June, 1856, Congress passed an act entitled "An act granting public lands to the State of Wisconsin to aid in the construction of railroads in said state." That act grants to the state for the purpose of aiding in the construction of a railroad between certain specified points every alternate section of land, designated by an odd number, for six sections in width on each side of the road. The language of the first section of the act is, "that there be and is hereby granted to the State of Wisconsin" the lands specified. The third section declares "that the said lands hereby granted to said state shall be subject to the disposal of the legislature thereof," and the fourth section provides in what manner sales shall be made, and enacts that if the road be not completed within ten years, "no further sales shall be made, and the lands unsold shall revert to the United States." The state accepted the grant thus made and assumed the execution of the trust. The route of the road was surveyed, and a map of its location was filed in the land office at Washington. The adjoining odd sections within the prescribed limits were then withdrawn from sale by the proper officers of the government and certified lists thereof, approved by the Secretary of the Interior, were delivered to the state. Subsequently, on the 5th of May, 1864, Congress passed another act on the same subject, entitled "An act granting lands to aid in the construction of certain railroads in the State of Wisconsin." By its first section, additional land is granted to the state upon the same terms and conditions as those contained in the previous act for the purpose of aiding in the construction of the road between certain of the points designated in the act of 1856, and the last act extends the time for completing the road for five years. This road has never been constructed, nor any part of it, and the time for its construction has not been extended since the Act of 1864. Nor has Congress passed any act, nor have any judicial proceedings been taken to enforce a forfeiture of the grants for failure to construct the road within the period prescribed.
Held:
1st. That the Act of June 3, 1856, and the first section of the Act of May 5, 1864, are grants in praesenti, and passed the title to the odd sections designated to be afterwards located; when the route was fixed, their location became certain and the title, which was previously imperfect, acquired precision and became attached to the land;
2d. That the lands granted have not reverted to the United States, although the road was not constructed within the period prescribed, no action having been taken either by legislation or judicial proceedings to enforce a forfeiture of the grants.
2. Unless there are clauses in a statute restraining the operation of words of present grant, these must be taken in their natural sense to import an immediate transfer of title, although subsequent proceedings may be
required to give precision to that title and attach it to specific tracts. No individual can call in question the validity of the proceedings by which precision is thus given to the title where the United States are satisfied with them.
3. The provision in the act of 1856 that all lands remaining unsold after ten years shall revert to the United States if the road be not then completed is a condition subsequent, being in effect a provision that the grant to the extent of the lands unsold shall be void if the work designated be not done within that period.
4. No one can take advantage of the nonperformance of a condition subsequent annexed to an estate in fee but the grantor or his heirs or successors, and if they do not see fit to assert their right to enforce a forfeiture on that ground, the title remains unimpaired in the grantee. The rate equally obtains where the grant upon condition proceeds from the government.
5. The manner in which the reserved right of the grantor for breach of the condition must be asserted so as to restore the estate depends upon the character of the grant. If it be a private grant, the right must be asserted by entry or its equivalent. If the grant be a public one, the right must be asserted by judicial proceedings authorized by law or there must be some legislative assertion of ownership of the property for breach of the condition, such as an act directing the possession and appropriation of the property, or that it be offered for sale or settlement.
6. Where the title to land remains in the state, timber cut upon the land belongs to the state. While the timber is standing, it constitutes a part of the realty; being severed from the soil, its character is changed -- it becomes personalty, but its title is not affected; it continues as previously the property of the owner of the land, and can be pursued wherever it is carried. All the remedies are open to the owner which the law affords in other cases of the wrongful removal or conversion of personal property.
7. Where logs cut from the lands of the state without license have been intermingled with logs cut from other lands so as not to be distinguishable, the state is entitled, under the law of Minnesota, to replevy an equal amount from the whole mass. The remedy afforded by the law of Minnesota in such case held to be just in its operation and less severe than that which the common law would authorize.
8. Where, in an action of replevin, the complaint alleges property and right of possession in the plaintiffs, and the answer traverses directly these allegations, under the issue thus formed any evidence is admissible on the port of the defendant which goes to show that the plaintiff have neither property nor right of possession. Evidence of title in a stranger is admissible.
Schulenberg and others brought replevin against Harriman for the possession of certain personal property, consisting
of over sixteen hundred thousand feet of pine saw logs, claimed by them, and alleged to be unlawfully detained from them by the defendant. The logs thus claimed were cut on
image:a
lands embraced in an act of Congress approved June 3, 1856, entitled "An act granting public lands to the State of Wisconsin to aid in the construction of railroads in said state." [Footnote 1] That act declares in its first section
"That there be, and is hereby, granted to the State of Wisconsin, for the purpose of aiding in the construction of a railroad from Madison or Columbus by the way of Portage City to the St. Croix River or lake, between townships twenty-five and thirty-one, and from thence to the west end of Lake Superior and to Bayfield, . . . every alternate section of land designated by odd numbers for six sections in width, on each side of the road, . . ."
and
"that the land hereby granted shall
be exclusively applied in the construction of the railroad for which it is granted and selected, and to no other purpose whatsoever. . . ."
In its third section, the act provides
"That the said lands hereby granted to said state shall be subject to the disposal of the legislature thereof for the purposes aforesaid and no other."
And in its fourth section, that the lands
"shall be disposed of by said state only in the manner following -- that is to say, a quantity of land not exceeding one hundred and twenty sections, and included within a continuous length of twenty miles of road, may be sold, and when the governor of said state shall certify to the Secretary of the Interior that any twenty continuous miles of said road are completed, then another like quantity of land hereby granted may be sold, and so on from time to time until said road is completed, and if said road is not completed within ten years no further sales shall be made, and the lands unsold shall revert to the United States."
The State of Wisconsin, by act of its legislature, accepted the grant thus made, and assumed the execution of the trust. The route of the road was surveyed, and a map of its location was filed in the land office at Washington. The adjoining odd sections within the prescribed limits were then withdrawn from sale by the proper officers of the government, and certified lists thereof, approved by the Secretary of the Interior, were delivered to the state.
Subsequently, on the 5th of May, 1864, Congress passed another act on the same subject entitled "An act granting lands to aid in the construction of certain railroads in the State of Wisconsin." [Footnote 2] By its first section, additional land was granted to the state upon the same terms and conditions contained in the previous act for the purpose of aiding in the construction of a railroad from a point on the St. Croix River or lake, between townships twenty-five and thirty-one, to the west end of Lake Superior, and from some point on the line of said railroad, to be selected by the state, to Bayfield, and the time for the completion of the road, as
mentioned in the previous act, was extended for the period of five years from the passage of the last act. The state, through its legislature, accepted this grant also.
There were also some other grants made by the act for other railroads.
The road here mentioned, and which is a part of the road designated in the Act of 1856, has never been constructed, nor has any part of it been constructed, and Congress has not passed any act since 1864 extending the time for its construction. Nor has Congress passed any act, nor have any judicial proceedings been taken by any branch of the government to enforce a forfeiture of the grants for failure to construct the road within the period prescribed.
The complaint in the case alleged property and right of possession in the plaintiffs. The answer among other matters traversed these allegations.
It was stipulated by the parties that the plaintiffs were in the quiet and peaceable possession of the logs at the time of their seizure by the defendant, and that such possession should be conclusive evidence of title in the plaintiffs against evidence of title in a stranger, unless the defendant should connect himself with such title by agency or authority in himself, and that the seizure of the property by the defendant was, so far as the manner of making the same was concerned, valid and legal in all respects, as though made under and by virtue of legal process, the evidence object of the stipulation being to test the right of the parties to the property independent of the manner of its seizure.
By an act of the Legislature of Wisconsin of March 3, 1869, the governor of the state was authorized to appoint competent persons as agents of the state, whose duty it was made to preserve and protect the timber growing upon the lands granted by the acts of Congress, and to take into possession on behalf of the state any logs and timber which might be cut on or carried away from those premises without lawful authority, wherever the same might be.
The evidence showed that defendant was appointed agent of the state under this act, and that as such agent he seized
the logs for which the present action was brought; that the logs were, during the years 1870 and 1871, floated from the places where they were cut down the River St. Croix into a boom at Stillwater, in the State of Minnesota, and were there intermingled with other logs of similar character and marks belonging to the plaintiffs, so that the particular logs cut on the lands granted to the state could not be distinguished from logs cut on other lands; that the boom from which the defendant seized the logs in suit was two and a half miles long, and from one to three-fourths of a mile wide, and contained about three hundred millions of feet of pine logs; that the defendant before the seizure demanded of the plaintiffs the logs cut on the lands granted, and the plaintiffs refused to deliver them.
The defendant contended in support of the seizure and of his right to the possession of the property:
1st. That the Act of Congress of June 3, 1856, and the first section of the Act of May 5, 1864, passed the legal title to the lands designated therein to the State of Wisconsin in trust for the construction of the railroad mentioned.
2d. That the lands designated have not reverted to the United States, although the road was not constructed within the period prescribed, no judicial proceedings nor any act on the part of the government having been taken to forfeit the grants.
3d. That the legal title to the lands being in the state, it was the owner of the logs cut thereon, and could authorize the defendant as its agent to take possession of them wherever found; and,
4th. That under the law of Minnesota, the plaintiffs having mingled the logs cut by them on the lands of the state with other logs belonging to them, so that the two classes could not be distinguished, the defendant had a right, after demand upon the plaintiffs, to take from the mass a quantity of logs equal to those which were cut on the lands of the state.
The plaintiffs controverted these several positions, and contended besides that under the stipulation of the parties and the pleadings in the case, no proof of title in the state
was admissible, and that if the acts of Congress vested a title in the state that title was transferred by the nineteenth section of an act of its legislature, passed March 10, 1869, to the St. Croix and Superior Railroad Company, a corporation then created for the purpose of constructing the railroads designated in those acts. That section was as follows:
"For the purpose of aiding in the construction of the railway hereby incorporated, the State of Wisconsin hereby transfers unto said company all the rights, title, interest, and estate, legal or equitable, now owned by the state in the lands heretofore conditionally granted to the St. Croix and Superior Railroad Company, for the construction of a railroad and branches; and . . . does further grant, transfer, and convey unto the said railway company . . . the possession, right, title, interest, and estate which the said State of Wisconsin may now have or shall hereafter acquire of, in, or to any lands, through gift, grant, or transfer from the United States, or by any act of the Congress of the United States, amending 'An act granting a portion of the public lands to the State of Wisconsin to aid in the construction of a railroad, approved June 3, 1856,' and the act or acts amendatory thereof, or by any future acts of the Congress of the United States granting lands to the State of Wisconsin, so far as the same may apply to, and in the construction of, a railroad from Bayfield, in the county of Bayfield, in a southwesterly direction, to the intersection of the main line of the Northern Wisconsin Railway, from the lake or River St. Croix to Superior, to have and to hold such lands, and the use, possession, and fee in the same, upon the express condition to construct the herein described railway within the several terms and spaces of time set forth and specified in the next preceding section of this act, and upon the construction and completion of every twenty miles of said railway the said company shall acquire the fee simple absolute in and to all that portion of lands granted to this state in any of the ways hereinbefore described by the Congress of the United States, appertaining to that portion of the railway so constructed and completed."
The following provisions of law are in force in Minnesota, and were in force when the logs in suit were seized by the defendant:
"SECTION 2. In cases where logs or timber bearing the same mark, but belonging to different owners in severalty, have, without fault of any of them, become so intermingled that the particular or identical logs or timber belonging to each cannot be designated, either of such owners may, upon a failure of anyone of them, having possession, to make a just division thereof, after demand, bring and maintain against such one in possession an action to recover his proportionate share of said logs or timber, and in such action he may claim and have the immediate delivery of such quantity of said logs or timber as shall equal his said share, in like manner and with like force and effect as though such quantity embraced his identical logs and timber and no other. [Footnote 3]"
The court below being of opinion in favor of the defendant, on the different points raised, he obtained judgment that he recover possession of the property which had been replevied from him after his seizure of the same, or the sum of $16,809, their value and costs. To reverse this judgment the plaintiffs brought the case here on writ of error.