SUPREME COURT OF THE UNITED STATES
_________________
No. 12–138
_________________
BG GROUP plc, PETITIONER v. REPUBLIC
OFARGENTINA
on writ of certiorari to the united states
court of appeals for the district of columbia circuit
[March 5, 2014]
Justice Breyer
delivered the opinion of the Court.
Article 8 of an
investment treaty between the United Kingdom and Argentina contains
a dispute-resolution pro-vision, applicable to disputes between one
of those na-tions and an investor from the other. See Agreementfor
the Promotion and Protection of Investments, Art. 8(2), Dec. 11,
1990, 1765 U. N. T. S. 38 (hereinafter Treaty). The provision
authorizes either party to submit a dispute “to the decision of the
competent tribunal of the Contracting Party in whose territory the
investment was made,” i.e., a local court. Art. 8(1). And it
provides for arbitration
“(i) where, after a period of eighteen months
has elapsed from the moment when the dispute was submitted to the
competent tribunal . . . , the said tribunal has not
given its final decision; [or]
“(ii) where the final decision of the
aforementioned tribunal has been made but the Parties are still in
dispute.” Art. 8(2)(a).
The Treaty also entitles the parties to agree to
proceed directly to arbitration. Art. 8(2)(b).
This case concerns the
Treaty’s arbitration clause, and specifically the local court
litigation requirement set forth in Article 8(2)(a). The question
before us is whether a court of the United States, in reviewing an
arbitration award made under the Treaty, should interpret and apply
the local litigation requirement de novo, or with the
deference that courts ordinarily owe arbitration decisions. That is
to say, who—court or arbitrator—bears primary responsibility for
interpreting and applying the local litigation requirement to an
underlying controversy? In our view, the matter is for the
arbitrators, and courts must review their determinations with
deference.
I
A
In the early 1990’s,
the petitioner, BG Group plc, a British firm, belonged to a
consortium that bought a majority interest in an Argentine entity
called MetroGAS. MetroGAS was a gas distribution company created by
Argentine law in 1992, as a result of the government’s
privatization of its state-owned gas utility. Argentina distributed
the utility’s assets to new, private companies, one of which was
MetroGAS. It awarded MetroGAS a 35-year exclusive license to
distribute natural gas in Buenos Aires, and it submitted a
controlling interest in the company to international public tender.
BG Group’s consor-tium was the successful bidder.
At about the same time,
Argentina enacted statutes providing that its regulators would
calculate gas “tariffs” in U. S. dollars, and that those
tariffs would be set at levels sufficient to assure gas
distribution firms, such as MetroGAS, a reasonable return.
In 2001 and 2002,
Argentina, faced with an economic crisis, enacted new laws. Those
laws changed the basis for calculating gas tariffs from dollars to
pesos, at a rate of one peso per dollar. The exchange rate at the
time was roughly three pesos to the dollar. The result was that
MetroGAS’ profits were quickly transformed into losses. BG Group
believed that these changes (and several others) violated the
Treaty; Argentina believed the contrary.
B
In 2003, BG Group,
invoking Article 8 of the Treaty, sought arbitration. The parties
appointed arbitrators; they agreed to site the arbitration in
Washington, D. C.; and between 2004 and 2006, the arbitrators
decided motions, received evidence, and conducted hearings. BG
Group essentially claimed that Argentina’s new laws and regulatory
practices violated provisions in the Treaty forbidding the
“expropriation” of investments and requiring that each nation give
“fair and equitable treatment” to investors from the other.
Argentina denied these claims, while also arguing that the
arbitration tribunal lacked “jurisdiction” to hear the dispute.
App. to Pet. for Cert. 143a–144a, 214a–218a, 224a–232a. According
to Argen-tina, the arbitrators lacked jurisdiction because: (1) BG
Group was not a Treaty-protected “investor”; (2) BG Group’s
interest in MetroGAS was not a Treaty-protected “investment”; and
(3) BG Group initiated arbitration without first litigating its
claims in Argentina’s courts, despite Article 8’s requirement. Id.,
at 143a–171a. In Argentina’s view, “failure by BG to bring its
grievance to Argentine courts for 18 months renders its claims in
this arbitration inadmissible.” Id., at 162a.
In late December 2007,
the arbitration panel reached a final decision. It began by
determining that it had “jurisdiction” to consider the merits of
the dispute. In support of that determination, the tribunal
concluded that BG Group was an “investor,” that its interest in
MetroGAS amounted to a Treaty-protected “investment,” and that
Argentina’s own conduct had waived, or excused, BG Group’s failure
to comply with Article 8’s local litigation requirement. Id., at
99a, 145a, 161a, 171a. The panel pointed out that in 2002, the
President of Argentina had issued a decree staying for 180 days the
execution of its courts’ final judgments (and injunctions) in suits
claiming harm as a result of the new economic measures. Id., at
166a–167a. In addition, Argentina had established a “renegotiation
process” for public service contracts, such as its contract with
MetroGAS, to alleviate the negative impact of the new economic
measures. Id., at 129a, 131a. But Argentina had simultaneously
barred from participation in that “process” firms that were
litigating against Argentina in court or in arbitration. Id., at
168a–171a. These measures, while not making litigation in
Argentina’s courts literally impossible, nonetheless “hindered”
recourse “to the domestic judiciary” to the point where the Treaty
implicitly excused compliance with the local litigation
requirement. Id., at 165. Requiring a private party in such
circumstances to seek relief in Argentina’s courts for 18 months,
the panel concluded, would lead to “absurd and unreasonable
result[s].” Id., at 166a.
On the merits, the
arbitration panel agreed with Argentina that it had not
“expropriate[d]” BG Group’s investment, but also found that
Argentina had denied BG Group “fair and equitable treatment.” Id.,
at 222a–223a, 240a–242a. It awarded BG Group $185 million in
damages. Id., at 297a.
C
In March 2008, both
sides filed petitions for review in the District Court for the
District of Columbia. BG Group sought to confirm the award under
the New York Convention and the Federal Arbitration Act. See
Convention on the Recognition and Enforcement of Foreign Arbitral
Awards, Art. IV, June 10, 1958, 21 U. S. T. 2519, T. I. A. S. No.
6997 (New York Convention) (providing that a party may apply “for
recognition and enforcement” of an arbitral award subject to the
Convention); 9 U. S. C. §§204, 207 (providing that a
party may move “for an order confirming [an arbitral] award” in a
federal court of the “place designated in the agreement as the
place of arbitration if such place is within the United States”).
Argentina sought to vacate the award in part on the ground that the
arbitrators lacked jurisdiction. See §10(a)(4) (a federal court may
vacate an arbitral award “where the arbitrators exceeded their
powers”).
The District Court
denied Argentina’s claims and confirmed the award. 764 F. Supp. 2d
21 (DC 2011); 715 F. Supp. 2d 108 (DC 2010). But the Court of
Appeals for the District of Columbia Circuit reversed. 665 F. 3d
1363 (2012). In the appeals court’s view, the interpretation and
application of Article 8’s local litigation requirement was a
matter for courts to decide de novo, i.e., without deference to the
views of the arbitrators. The Court of Appeals then went on to hold
that the circumstances did not excuse BG Group’s failure to comply
with the requirement. Rather, BG Group must “commence a lawsuit in
Argentina’s courts and wait eighteen months before filing for
arbitration.” Id., at 1373. Because BG Group had not done so, the
arbitrators lacked authority to decide the dispute. And the appeals
court ordered the award vacated. Ibid.
BG Group filed a
petition for certiorari. Given the importance of the matter for
international commercial ar-bitration, we granted the petition.
See, e.g., K. Van-develde, Bilateral Investment Treaties: History,
Policy& Interpretation 430–432 (2010) (explaining that
dispute-resolution mechanisms allowing for arbitration are a
“critical element” of modern day bilateral investment treaties); C.
Dugan, D. Wallace, N. Rubins, & B. Sabahi, Investor-State
Arbitration 51–52, 117–120 (2008) (referring to the large number of
investment treaties that provide for arbitration, and explaining
that some also impose prearbitration requirements such as waiting
periods, amicable negotiations, or exhaustion of local
remedies).
II
As we have said, the
question before us is who—court or arbitrator—bears primary
responsibility for interpreting and applying Article 8’s local
court litigation provision. Put in terms of standards of judicial
review, should a United States court review the arbitrators’
interpretation and application of the provision de novo, or
with the deference that courts ordinarily show arbitral decisions
on matters the parties have committed to arbitration? Compare,
e.g., First Options of Chicago, Inc. v. Kaplan, 514 U. S. 938,
942 (1995) (example where a “court makes up its mind about [an
issue] independently” because the parties did not agree it should
be arbitrated), with Oxford Health Plans LLC v. Sutter, 569
U. S. ___, ___ (2013) (slip op., at 4) (example where a court
defers to arbitrators because the parties “ ‘bargained
for’ ” arbitral resolution of the question (quoting Eastern
Associated Coal Corp. v. Mine Workers, 531 U. S. 57, 62 (2000)
)). See also Hall Street Associates, L. L. C. v. Mattel, Inc., 552
U. S. 576, 588 (2008) (on matters committed to arbitration,
the Federal Arbitration Act provides for “just the limited review
needed to maintain arbitration’s essential virtue of resolving
disputes straightaway” and to prevent it from be-coming “merely a
prelude to a more cumbersome andtime-consuming judicial review
process” (internal quotation marks omitted)); Eastern Associated
Coal Corp., supra, at 62 (where parties send a matter to
arbitration, a court will set aside the “arbitrator’s
interpretation of what their agreement means only in rare
instances”).
In answering the
question, we shall initially treat the document before us as if it
were an ordinary contract between private parties. Were that so, we
conclude, the matter would be for the arbitrators. We then ask
whether the fact that the document in question is a treaty makes a
critical difference. We conclude that it does not.
III
Where ordinary
contracts are at issue, it is up to the parties to determine
whether a particular matter is primarily for arbitrators or for
courts to decide. See, e.g., Steelworkers v. Warrior & Gulf Nav.
Co., 363 U. S. 574, 582 (1960) (“[A]rbitration is a matter of
contract and a party cannot be required to submit to arbitration
any dispute which he has not agreed so to submit”). Ifthe contract
is silent on the matter of who primarilyis to decide “threshold”
questions about arbitration,courts determine the parties’ intent
with the help ofpresumptions.
On the one hand, courts
presume that the parties intend courts, not arbitrators, to decide
what we have called disputes about “arbitrability.” These include
questions such as “whether the parties are bound by a given
arbitration clause,” or “whether an arbitration clause in a
con-cededly binding contract applies to a particular type of
controversy.” Howsam v. Dean Witter Reynolds, Inc., 537 U. S.
79, 84 (2002) ; accord, Granite Rock Co. v. Teamsters, 561
U. S. 287 –300 (2010) (disputes over “formation of the
parties’ arbitration agreement” and “its enforceability or
applicability to the dispute” at issue are “matters . . .
the court must resolve” (internal quotation marks omitted)). See
First Options, supra, at 941, 943–947 (court should decide whether
an arbitration clause applied to a party who “had not personally
signed” the document containing it); AT&T Technologies, Inc. v.
Communications Workers, 475 U. S. 643, 651 (1986) (court should
decide whether a particular labor-management layoff dispute fell
within the arbitration clause of a collective-bargaining contract);
John Wiley & Sons, Inc. v. Livingston, 376 U. S. 543 –548
(1964) (court should decide whether an arbitration provision
survived a corporate merger). See generally AT&T Technologies,
supra, at 649 (“Unless the parties clearly and unmistakably provide
otherwise, the question of whether the parties agreed to arbitrate
is to be decided by the court, not the arbitrator”).
On the other hand,
courts presume that the parties intend arbitrators, not courts, to
decide disputes about the meaning and application of particular
procedural preconditions for the use of arbitration. See Howsam,
supra, at 86 (courts assume parties “normally expect a forum-based
decisionmaker to decide forum-specific procedural gateway matters”
(emphasis added)). These procedural matters include claims of
“waiver, delay, or a like defense to arbitrability.” Moses H. Cone
Memorial Hospital v. Mercury Constr. Corp., 460 U. S. 1, 25 (1983)
. And they include the satisfaction of “ ‘prerequisites such
as time limits, notice, laches, estoppel, and other conditions
precedent to an obligation to arbitrate.’ ” Howsam, supra, at
85 (quoting the Revised Uniform Arbitration Act of 2000 §6, Comment
2, 7 U. L. A. 13 (Supp. 2002); emphasis deleted). See also
§6(c) (“An arbitrator shall decide whether a condition precedent to
arbitrability has been fulfilled”); §6, Comment 2 (explaining that
this rule reflects “the holdings of the vast majority of state
courts” and collecting cases).
The provision before us
is of the latter, procedural, variety. The text and structure of
the provision make clear that it operates as a procedural condition
precedent to arbitration. It says that a dispute “shall be
submitted to international arbitration” if “one of the Parties so
requests,” as long as “a period of eighteen months has elapsed”
since the dispute was “submitted” to a local tribunal and the
tribunal “has not given its final decision.” Art. 8(2). It
determines when the contractual duty to arbitrate arises, not
whether there is a contractual duty to arbitrate at all. Cf. 13 R.
Lord, Williston on Contracts §38:7, pp. 435, 437; §38:4, p. 422
(4th ed. 2013) (a “condition precedent” determines what must happen
before “a contractual duty arises” but does not “make the validity
of the contract depend on its happening” (emphasis added)). Neither
does this language or other language in Article 8 give substantive
weight to the local court’s determinations on the matters at issue
between the parties. To the contrary, Article 8 provides that only
the “arbitration decision shall be final and binding on both
Parties.” Art. 8(4). The litigation provision is consequently a
purely procedural requirement—a claims-processing rule that governs
when the arbitration may begin, but not whether it may occur or
what its substantive outcome will be on the issues in dispute.
Moreover, the local
litigation requirement is highly analogous to procedural provisions
that both this Court and others have found are for arbitrators, not
courts, primarily to interpret and to apply. See Howsam, supra, at
85 (whether a party filed a notice of arbitration within the time
limit provided by the rules of the chosen arbitral forum “is a
matter presumptively for the arbitrator, not for the judge”); John
Wiley, supra, at 555–557 (same, in respect to a mandatory
prearbitration grievance procedure that involved holding two
conferences). See also Dialysis Access Center, LLC v. RMS Lifeline,
Inc., 638 F. 3d 367, 383 (CA1 2011) (same, in respect to a
prearbitration “good faith negotiations” requirement); Lumbermens
Mut. Cas. Co. v. Broadspire Management Servs., Inc., 623 F. 3d 476,
481 (CA7 2010) (same, in respect to a prearbitration filing of a
“Disagreement Notice”).
Finally, as we later
discuss in more detail, see infra, at 13–14, we can find
nothing in Article 8 or elsewhere in the Treaty that might overcome
the ordinary assumption. It nowhere demonstrates a contrary intent
as to the delegation of decisional authority between judges and
arbitrators. Thus, were the document an ordinary contract, it would
call for arbitrators primarily to interpret and to apply the local
litigation provision.
IV
A
We now relax our
ordinary contract assumption and ask whether the fact that the
document before us is a treaty makes a critical difference to our
analysis. The Solicitor General argues that it should. He says that
the local litigation provision may be “a condition on the State’s
consent to enter into an arbitration agreement.” Brief for United
States as Amicus Curiae 25. He adds that courts should “review de
novo the arbitral tribunal’s resolution of objections based on an
investor’s non-compliance” with such a condition. Ibid. And he
recommends that we remand this case to the Court of Appeals to
determine whether the court-exhaustion provision is such a
condition. Id., at 31–33.
1
We do not accept the
Solicitor General’s view as applied to the treaty before us. As a
general matter, a treaty isa contract, though between nations. Its
interpretation normally is, like a contract’s interpretation, a
matter of determining the parties’ intent. Air France v. Saks, 470
U. S. 392, 399 (1985) (courts must give “the specific words of
the treaty a meaning consistent with the shared expectations of the
contracting parties”); Sullivan v. Kidd, 254 U. S. 433, 439
(1921) (“[T]reaties are to be interpreted upon the principles which
govern the interpretation of contracts in writing between
individuals, and are to be executed in the utmost good faith, with
a view to making effective the purposes of the high contracting
parties”); Wright v. Henkel, 190 U. S. 40, 57 (1903)
(“Treaties must receive a fair interpretation, according to the
intention of the contracting parties”). And where, as here, a
federal court is asked to interpret that intent pursuant to a
motion to vacate or confirm an award made in the United States
under the Federal Arbitration Act, it should normally apply the
presumptions supplied by American law. See New York Convention,
Art. V(1)(e) (award may be “set aside or suspended by a competent
authority of the country in which, or under the law of which, that
award was made”); Vandevelde, Bilateral Investment Treaties, at 446
(arbitral awards pursuant to treaties are “subject to review under
the arbitration law of the state where the arbitration takes
place”); Dugan, Investor-State Arbitration, at 636 (“[T]he national
courts and the law of the legal situs of arbitration control a
losing party’s attempt to set aside [an] award”).
The Solicitor General
does not deny that the presumption discussed in Part III, supra
(namely, the presumption that parties intend procedural
preconditions to arbitration to be resolved primarily by
arbitrators), applies both to ordinary contracts and to similar
provisions in treaties when those provisions are not also
“conditions of consent.” Brief for United States as Amicus Curiae
25–27. And, while we respect the Government’s views about the
proper interpretation of treaties, e.g., Abbott v. Abbott, 560
U. S. 1, 15 (2010) , we have been unable to find any other
authority or precedent suggesting that the use of the “consent”
label in a treaty should make a critical differencein discerning
the parties’ intent about whether courtsor arbitrators should
interpret and apply the relevant provision.
We are willing to
assume with the Solicitor General that the appearance of this label
in a treaty can show that the parties, or one of them, thought the
designated matter quite important. But that is unlikely to be
conclusive. For parties often submit important matters to
arbitration. And the word “consent” could be attached to a highly
procedural precondition to arbitration, such as a waiting period of
several months, which the parties are unlikely to have intended
that courts apply without saying so. See, e.g., Agreement on
Encouragement and Reciprocal Protection of Investments, Art. 9,
Netherlands-Slovenia, Sept. 24, 1996, Netherlands T. S. No. 296
(“Each Contracting Party hereby consents to submit any dispute
. . . which they can not [sic] solve amicably within
three months . . . to the International Center for
Settlement of Disputesfor settlement by conciliation or
arbitration”), online at
www.rijksoverheid.nl/documenten-en-publicaties/besluiten/2006/10/17/slovenia.html
(all Internet materials as visited on Feb. 28, 2014, and available
in Clerk of Court’s case file); Agreement for the Promotion and
Protection ofInvestments, Art. 8(1), United Kingdom-Egypt, June 11,
1975, 14 I. L. M. 1472 (“Each Contracting Party hereby consents to
submit” a dispute to arbitration if “agreement cannot be reached
within three months between the parties”). While we leave the
matter open for future argument, we do not now see why the presence
of the term “consent” in a treaty warrants abandoning, or
increasing the complexity of, our ordinary intent-determining
framework. See Howsam, 537 U. S., at 83–85; First Options, 514
U. S., at 942–945; John Wiley, 376 U. S., at 546–549, 555–559.
2
In any event, the
treaty before us does not state that the local litigation
requirement is a “condition of consent” to arbitration. Thus, we
need not, and do not, go beyond holding that, in the absence of
explicit language in atreaty demonstrating that the parties
intended a different delegation of authority, our ordinary
interpretive framework applies. We leave for another day the
question of interpreting treaties that refer to “conditions of
consent” explicitly. See, e.g., United States-Korea Free Trade
Agreement, Art. 11.18, Feb. 10, 2011 (provision entitled
“Conditions and Limitations on Consent of Each Party” and providing
that “[n]o claim may be submitted toarbitration under this Section”
unless the claimantwaives in writing “any right” to press his claim
beforean “administrative tribunal or court”), online at
www.ustr.gov/trade-agreements/free-trade-agreements/korus-fta/final-text;
North American Free Trade Agreement, Arts. 1121–1122, Dec. 17,
1992, 32 I. L. M. 643–644 (pro-viding that each party’s “[c]onsent
to [a]rbitration” is conditioned on fulfillment of certain
“procedures,” one of which is a waiver by an investor of his right
to litigate the claim being arbitrated). See also 2012 U. S.
Model Bilateral Investment Treaty, Art. 26 (entitled “Conditions
and limitations on Consent of Each Party”), online at
www.ustr.gov / sites / default / files / BIT %20text%20for%20ACIEP%20Meeting.pdf.
And we apply our ordinary presumption that the interpretation and
application of procedural provisions such as the provision before
us are primarily for the arbitrators.
B
A treaty may contain
evidence that shows the parties had an intent contrary to our
ordinary presumptions about who should decide threshold issues
related to arbitration. But the treaty before us does not show any
such contrary intention. We concede that the local litigation
requirement appears in ¶(1) of Article 8, while the Article does
not mention arbitration until the subsequent paragraph, ¶(2).
Moreover, a requirement that a party exhaust its remedies in a
country’s domestic courts before seeking to arbitrate may seem
particularly important to a country offering protections to foreign
investors. And the placing of an important matter prior to any
mention of arbitration at least arguably suggests an intent by
Argentina, the United Kingdom, or both, to have courts rather than
arbitrators apply the litigation requirement.
These considerations,
however, are outweighed by others. As discussed supra, at 8–9,
the text and structure of the litigation requirement set forth in
Article 8 make clear that it is a procedural condition precedent to
arbitration—a sequential step that a party must follow before
giving notice of arbitration. The Treaty nowhere says that the
provision is to operate as a substantive condition on the formation
of the arbitration contract, or that it is a matter of such
elevated importance that it is to be decided by courts.
International arbitrators are likely more familiar than are judges
with the expectations of foreign investors and recipient nations
regarding the operation of the provision. See Howsam, supra, at 85
(comparative institutional expertise a factor in determining
parties’ likely intent). And the Treaty itself authorizes the use
of international arbitration associations, the rules of which
provide that arbitrators shall have the authority to interpret
provisions of this kind. Art. 8(3) (providing that the parties may
refer a dispute to the International Centre for the Settlement of
Investment Disputes (ICSID) or to arbitrators appointed pursuant to
the arbitration rules of the United Nations Commission on
International Trade Law (UNCITRAL)); accord, UNCITRAL Arbitration
Rules, Art. 23(1) (rev. 2010 ed.) (“[A]rbitral tribunal shall have
the power to rule on its own jurisdiction”); ICSID Convention,
Regulations and Rules, Art. 41(1) (2006 ed.) (“Tribunal shall be
the judge of its own competence”). Cf. Howsam, supra, at 85 (giving
weight to the parties’ incorporation of the National Association of
Securities Dealers’ Code of Arbitration into their contract, which
provided for similar arbitral authority, as evidence that they
intended arbitrators to “interpret and apply the NASD time limit
rule”).
The upshot is that our
ordinary presumption applies and it is not overcome. The
interpretation and application of the local litigation provision is
primarily for the arbi-trators. Reviewing courts cannot review
their decisionde novo. Rather, they must do so with
considerabledeference.
C
The dissent
interprets Article 8’s local litigation provision differently. In
its view, the provision sets forth not a condition precedent to
arbitration in an already-binding arbitration contract (normally a
matter for arbitrators to interpret), but a substantive condition
on Argentina’s con-sent to arbitration and thus on the contract’s
formationin the first place (normally something for courts to
interpret). It reads the whole of Article 8 as a “unilateral
standing offer” to arbitrate that Argentina and the United Kingdom
each extends to investors of the other country. Post, at 9 (opinion
of Roberts, C. J.). And it says that the local litigation
requirement is one of the essential “ ‘terms in which the
offer was made.’ ” Post, at 6 (quoting Eliason v. Henshaw, 4
Wheat. 225, 228 (1819); emphasis deleted).
While it is possible to
read the provision in this way, doing so is not consistent with our
case law interpreting similar provisions appearing in ordinary
arbitration contracts. See Part III, supra. Consequently,
interpreting the provision in such a manner would require us to
treat treaties as warranting a different kind of analysis. And the
dissent does so without supplying any different set of general
principles that might guide that analysis. That is a matter of some
concern in a world where foreign investment and related arbitration
treaties increasingly matter.
Even were we to ignore our ordinary contract
principles, however, we would not take the dissent’s view. As we
have explained, the local litigation provision on its face concerns
arbitration’s timing, not the Treaty’s effective date; or whom its
arbitration clause binds; or whether that arbitration clause covers
a certain kind of dispute. Cf. Granite Rock, 561 U. S., at
296–303 (ratification date); First Options, 514 U. S., at 941,
943–947 (parties); AT&T Technologies, 475 U. S., at 651 (kind
of dispute). The dissent points out that Article 8(2)(a) “does not
simply require the parties to wait for 18 months before proceeding
to arbitration,” but instructs them to do something—to “submit
their claims for adjudication.” Post, at 8. That is correct. But
the something they must do has no direct impact on the resolution
of their dispute, for as we previously pointed out, Article 8
provides that only the decision of the arbitrators (who need not
give weight to the local court’s decision) will be “final and
binding.” Art. 8(4). The provision, at base, is a claims-processing
rule. And the dissent’s efforts to imbue it with greater
significance fall short.
The treatises to which
the dissent refers also fail to support its position. Post, at 3,
6. Those authorities primarily describe how an offer to arbitrate
in an investment treaty can be accepted, such as through an
investor’s filing of a notice of arbitration. See J. Salacuse, The
Law of Investment Treaties 381 (2010); Schreuer, Consent to
Arbitration, in The Oxford Handbook of International Investment Law
830, 836–837 (P. Muchlinski, F. Ortino, & C. Schreuer eds. 2008);
Dugan, Investor-State Arbitration, at 221–222. They do not endorse
the dissent’s reading of the local litigation provision or of
provisions like it.
To the contrary, the
bulk of international authority supports our view that the
provision functions as a purely procedural precondition to
arbitrate. See 1 G. Born, International Commercial Arbitration 842
(2009) (“A substantial body of arbitral authority from
investor-state disputes concludes that compliance with procedural
mechanisms in an arbitration agreement (or bilateral investment
treaty) is not ordinarily a jurisdictional prerequisite”); Brief
for Professors and Practitioners of Arbitration Law as Amici Curiae
12–16 (to assume the parties intended de novo review of the
provision by a court “is likely toset United States courts on a
collision course with the international regime embodied in
thousands of [bilateral investment treaties]”). See also Schreuer,
Consent to Arbitration, supra, at 846–848 (“clauses of this kind
. . . creat[e] a considerable burden to the party seeking
arbitration with little chance of advancing the settlement of the
dispute,” and “the most likely effect of a clause of this kind is
delay and additional cost”).
In sum, we agree with
the dissent that a sovereign’s consent to arbitration is important.
We also agree that sovereigns can condition their consent to
arbitrate by writing various terms into their bilateral investment
treaties. Post, at 9–10. But that is not the issue. The question is
whether the parties intended to give courts or arbitrators primary
authority to interpret and apply a threshold provision in an
arbitration contract—when the contract is silent as to the
delegation of authority. We have already explained why we believe
that where, as here, the provision resembles a claims-processing
requirement and is not a requirement that affects the arbitration
contract’s validity or scope, we presume that the parties (even if
they are sovereigns) intended to give that authority to the
arbitrators. See Parts III, IV–A andIV–B, supra.
V
Argentina correctly
argues that it is nonetheless en-titled to court review of the
arbitrators’ decision to excuse BG Group’s noncompliance with the
litigation requirement, and to take jurisdiction over the dispute.
It asks us to provide that review, and it argues that even if the
proper standard is “a [h]ighly [d]eferential” one, it should still
prevail. Brief for Respondent 50. Having the relevant materials
before us, we shall provide that review. But we cannot agree with
Argentina that the arbitrators “ ‘exceeded their
powers’ ” in concluding they had jurisdiction. Ibid. (quoting
9 U. S. C. §10(a)(4)).
The arbitration panel
made three relevant determinations:
(1) “As a matter of
treaty interpretation,” the local litigation provision “cannot be
construed as an absolute impediment to arbitration,” App. to Pet.
for Cert. 165a;
(2) Argentina enacted
laws that “hindered” “recourse to the domestic judiciary” by those
“whose rights were allegedly affected by the emergency measures,”
id., at 165a–166a; that sought “to prevent any judicial
interference with the emergency legislation,” id., at 169a; and
that “excluded from the renegotiation process” for public service
contracts “any licensee seeking judicial redress,” ibid.;
(3) under these
circumstances, it would be “absurd and unreasonable” to read
Article 8 as requiring an investor to bring its grievance to a
domestic court before arbitrating. Id., at 166a.
The first determination
lies well within the arbitrators’ interpretive authority.
Construing the local litigation provision as an “absolute”
requirement would mean Argentina could avoid arbitration by, say,
passing a law that closed down its court system indefinitely or
that prohibited investors from using its courts. Such an
interpretation runs contrary to a basic objective of the investment
treaty. Nor does Argentina argue for an absolute
interpretation.
As to the second
determination, Argentina does not argue that the facts set forth by
the arbitrators are incorrect. Thus, we accept them as valid.
The third determination
is more controversial. Argen-tina argues that neither the 180-day
suspension of courts’ issuances of final judgments nor its refusal
to allow litigants (and those in arbitration) to use its contract
renegotiation process, taken separately or together, warrants
suspending or waiving the local litigation requirement. We would
not necessarily characterize these actions as rendering a domestic
court-exhaustion requirement “absurd and unreasonable,” but at the
same time we cannot say that the arbitrators’ conclusions are
barred by the Treaty. The arbitrators did not “ ‘stra[y] from
interpretation and application of the agreement’ ” or
otherwise “ ‘effectively “dispens[e]” ’ ” their
“ ‘own brand of . . . justice.’ ” Stolt-Nielsen
S. A. v. AnimalFeeds Int’l Corp., 559 U. S. 662, 671 (2010)
(providing that it is only when an arbitrator engages in such
activity that “ ‘his decision may be unenforceable’ ”
(quoting Major League Baseball Players Assn. v. Garvey, 532 U. S.
504, 509 (2001) (per curiam)).
Consequently, we
conclude that the arbitrators’ jurisdictional determinations are
lawful. The judgment of the Court of Appeals to the contrary is
reversed.
It is so ordered.
SUPREME COURT OF THE UNITED STATES
_________________
No. 12–138
_________________
BG GROUP plc, PETITIONER v. REPUBLIC
OFARGENTINA
on writ of certiorari to the united states
court of appeals for the district of columbia circuit
[March 5, 2014]
Chief Justice
Roberts, with whom Justice Kennedy joins, dissenting.
The Court begins by
deciding a different case, “initially treat[ing] the document
before us as if it were an ordinary contract between private
parties.” Ante, at 6. The “document before us,” of course, is
nothing of the sort. It is instead a treaty between two sovereign
nations: the United Kingdom and Argentina. No investor is a party
to the agreement. Having elided this rather important fact for much
of its analysis, the majority finally “relax[es] [its] ordinary
contract assumption and ask[s] whether the fact that the document
before us is a treaty makes a critical difference to [its]
analysis.” Ante, at 10. It should come as no surprise that, after
starting down the wrong road, the majority ends up at the wrong
place.
I would start with the
document that is before us and take it on its own terms. That
document is a bilateral investment treaty between the United
Kingdom and Argentina, in which Argentina agreed to take steps to
encourage U. K. investors to invest within its borders (and
the United Kingdom agreed to do the same with respect to Argentine
investors). Agreement for the Promotion and Protection of
Investments, Dec. 11, 1990, 1765 U. N. T. S. 33 (Treaty). The
Treaty does indeed contain a completed agreement for
arbitration—between the signatory countries. Art. 9. The Treaty
also includes, in Article 8, certain provisions for resolving any
disputes that might arise between a signatory country and an
investor, who is not a party to the agreement.
One such
provision—completely ignored by the Court in its analysis—specifies
that disputes may be resolved by arbitration when the host country
and an investor “have so agreed.” Art. 8(2)(b), 1765 U. N. T. S.
38. No one doubts that, as is the normal rule, whether there was
such an agreement is for a court, not an arbitrator, to decide. See
First Options of Chicago, Inc. v. Kaplan, 514 U. S. 938 –945
(1995).
When there is no
express agreement between the host country and an investor, they
must form an agreement in another way, before an obligation to
arbitrate arises. The Treaty by itself cannot constitute an
agreement to arbitrate with an investor. How could it? No investor
is a party to that Treaty. Something else must happen to create an
agreement where there was none before. Article 8(2)(a) makes clear
what that something is: An investor must submit his dispute to the
courts of the host country. After 18 months, or an unsatisfactory
decision, the investor may then request arbitration.
Submitting the dispute
to the courts is thus a condition to the formation of an agreement,
not simply a matter of performing an existing agreement. Article
8(2)(a) constitutes in effect a unilateral offer to arbitrate,
which an investor may accept by complying with its terms. To be
sure, the local litigation requirement might not be absolute. In
particular, an investor might argue that it was an implicit aspect
of the unilateral offer that he be afforded a reasonable
opportunity to submit his dispute to the local courts. Even then,
however, the question would remain whether the investor has managed
to form an arbitration agreement with the host country pursuant to
Article 8(2)(a). That question under Article 8(2)(a) is—like the
same question under Article 8(2)(b)—for a court, not an arbitrator,
to decide. I respectfully dissent from the Court’s contrary
conclusion.
I
The majority
acknowledges—but fails to heed—“the first principle that
underscores all of our arbitration decisions: Arbitration is
strictly ‘a matter of consent.’ ” Granite Rock Co. v.
Teamsters, 561 U. S. 287, 299 (2010) (quoting Volt Information
Sciences, Inc. v. Board of Trustees of Leland Stanford Junior
Univ., 489 U. S. 468, 479 (1989) ); see ante, at 7. We have
accordingly held that arbitration “is a way to resolve those
disputes—but only those disputes—that the parties have agreed to
submit to arbitration.” First Options of Chicago, Inc., supra, at
943. The same “first principle” underlies arbitration pursuant to
bilateral investment treaties. See C. Dugan, D. Wallace, N. Rubins,
& B. Sabahi, Investor-State Arbitration 219 (2008) (Dugan); J.
Salacuse, The Law of Investment Treaties 385 (2010); K. Vandevelde,
Bilateral Investment Treaties: History, Policy, and Interpretation
433 (2010). So only if Argentina agreed with BG Group to have an
arbitrator resolve their dispute did the arbitrator in this case
have any authority over the parties.
The majority opinion
nowhere explains when and how Argentina agreed with BG Group to
submit to arbitration. Instead, the majority seems to assume that,
in agreeing with the United Kingdom to adopt Article 8 along with
the rest of the Treaty, Argentina thereby formed an agreement with
all potential U. K. investors (including BG Group) to submit
all investment-related disputes to arbitration. That misunderstands
Article 8 and trivializes the significance to a sovereign nation of
subjecting itself to arbitration anywhere in the world, solely at
the option of private parties.
A
The majority focuses
throughout its opinion on what it calls the Treaty’s “arbitration
clause,” ante, at 1, but that provision does not stand alone.
Rather, it is only part—and a subordinate part at that—of a broader
dispute resolution provision. Article 8 is thus entitled
“Settlement of Disputes Between an Investor and the Host State,”
and it opens without so much as mentioning arbitration. 1765 U. N.
T. S. 37. Instead it initially directs any disputing investor and
signatory country (what the Treaty calls a “Contracting Party”) to
court. When “an investor of one Contracting Party and the other
Contracting Party” have an investment-related dispute that has “not
been amicably settled,” the Treaty commands that the dispute “shall
be submitted, at the request of one of the Parties to the dispute,
to the decision of the competent tribunal of the Contracting Party
in whose territory the investment was made.” Art. 8(1), id., at
37–38. (emphasis added). This provision could not be clearer:
Before taking any other steps, an aggrieved investor must submit
its dispute with a Contracting Party to that Contracting Party’s
own courts.
There are two routes to
arbitration in Article 8(2)(a), and each passes through a
Contracting Party’s domestic courts. That is, the Treaty’s
arbitration provisions in Article 8(2)(a) presuppose that the
parties have complied with the local litigation provision in
Article 8(1). Specifically, a party may request arbitration only
(1) “after a period of eighteen months has elapsed from the moment
when the dispute was submitted to the competent tribunal of the
Contracting Party in whose territory the investment was made” and
“the said tribunal has not given its final decision,” Art.
8(2)(a)(i), id., at 38, or (2) “where the final decision of the
aforementioned tribunal has been made but the Parties are still in
dispute,” Art. 8(2)(a)(ii), ibid. Either way, the obligation to
arbitrate does not arise until the Contracting Party’s courts have
had a first crack at the dispute.
Article 8 provides a
third route to arbitration in paragraph 8(2)(b)—namely, “where the
Contracting Party and the investor of the other Contracting Party
have so agreed.” Ibid. In contrast to the two routes in Article
8(2)(a), this one does not refer to the local litigation provision.
That omission is significant. It makes clear that an investor can
bypass local litigation only by obtaining the Contracting Party’s
explicit agreement to proceed directly to arbitration. Short of
that, an investor has no choice but to litigate in the Contracting
Party’s courts for at least some period.
The structure of
Article 8 confirms that the routes to arbitration in paragraph
(2)(a) are just as much about eliciting a Contracting Party’s
consent to arbitrate as the route in paragraph 8(2)(b). Under
Article 8(2)(b), the requisite consent is demonstrated by a
specific agreement. Under Article 8(2)(a), the requisite consent is
demonstrated by compliance with the requirement to resort to a
country’s local courts.
Whereas Article 8(2)(a)
is part of a completed agreement between Argentina and the United
Kingdom, it constitutes only a unilateral standing offer by
Argentina with respect to U. K. investors—an offer to submit
to arbitration where certain conditions are met. That is how
scholars understand arbitration provisions in bilateral investment
treaties in general. See Dugan 221; Salacuse 381; Brief for
Practitioners and Professors of International Arbitration Law as
Amici Curiae 4. And it is how BG Group itself describes this
investment treaty in particular. See Brief for Petitioner 43 (the
Treaty is a “standing offer” by Argentina “to arbitrate”); Reply
Brief 9 (same).
An offer must be
accepted for a legally binding contract to be formed. And it is an
“undeniable principle of the law of contracts, that an offer
. . . by one person to another, imposes no obligation
upon the former, until it is accepted by the latter, according to
the terms in which the offerwas made. Any qualification of, or
departure from, those terms, invalidates the offer.” Eliason v.
Henshaw, 4 Wheat. 225, 228 (1819) (emphasis added). This principle
applies to international arbitration agreements just as it does to
domestic commercial contracts. See Dugan 221–222; Salacuse 381;
Schreuer, Consent to Arbitration, in The Oxford Handbook of
International Investment Law 830, 836–837 (P. Muchlinski, F.
Ortino, & C. Schreuer eds. 2008).
By incorporating the
local litigation provision in Article 8(1), paragraph 8(2)(a)
establishes that provision as a term of Argentina’s unilateral
offer to arbitrate. To accept Argentina’s offer, an investor must
therefore first litigate its dispute in Argentina’s courts—either
to a “final decision” or for 18 months, whichever comes first.
Unless the investor does so (or, perhaps, establishes a valid
excuse for failing to do so, as discussed below, see infra, at 17),
it has not accepted the terms of Argentina’s offer to arbitrate,
and thus has not formed an arbitration agreement with
Argentina.[
1]
Although the majority
suggests that the local litigation requirement would not be a
“condition of consent” even if the Treaty explicitly called it one,
the Court’s holding is limited to treaties that contain no such
clear statement. See ante, at 11–13. But there is no reason to
think that such a clear statement should be required, for we
generally do not require “talismanic words” in treaties. Medellínv.
Texas, 552 U. S. 491, 521 (2008) . Indeed, another arbi-tral
tribunal concluded that the local litigation require-ment was a
condition on Argentina’s consent to arbitrate despite the absence
of the sort of clear statement apparently contemplated by the
majority. See ICS Inspection & Control Servs. Ltd. v. Argentine
Republic, PCA Case No. 2010–9, Award on Jurisdiction, ¶262 (Feb.
10, 2012). Still other tribunals have reached the same conclusion
with regard to similar litigation requirements in other Argentine
bilateral investment treaties. See Daimler Financial Servs. AG v.
Argentine Republic, ICSID Case No. ARB/05/1, Award, ¶¶193, 194
(Aug. 22, 2012); Wintershall Aktiengesellschaft v. Argentine
Republic, ICSID Case No. ARB/04/14, Award, ¶116 (Dec. 8, 2008).
In the face of this
authority, the majority quotes a treatise for the proposition that
“ ‘[a] substantial body of arbitral authority from
investor-state disputes concludes that compliance with procedural
mechanisms in an arbitration agreement (or bilateral investment
treaty) is not ordinarily a jurisdictional prerequisite.’ ”
Ante, at 16 (quoting 1 G. Born, International Commercial
Arbitration 842 (2009)). But that simply restates the question. The
whole issue is whether the local litigation requirement is a mere
“procedural mechanism” or instead a condition on Argentina’s
consent to arbitrate.
BG Group concedes that
other terms of Article 8(1) constitute conditions on Argentina’s
consent to arbitrate, even though they are not expressly labeled as
such. See Tr. of Oral Arg. 57 (“You have to be a U. K. investor,
you have to have a treaty claim, you have to be suing another party
to the treaty. And if those aren’t true, then there is no
arbitration agreement” (emphasis added)). The Court does not
explain why the only other term—the litigation requirement—should
be viewed differently.
Nor does the majority’s
reading accord with ordinary contract law, which treats language
such as the word “after” in Article 8(2)(a)(i) as creating
conditions, even though such language may not constitute a “clear
state-ment.” See 13 R. Lord, Williston on Contracts §38:16 (4th ed.
2013). The majority seems to regard the local litigation
requirement as a condition precedent to performance of the
contract, rather than a condition precedent to formation of the
contract. Ante, at 8–9; see 13 Lord §§38:4, 38:7. But that cannot
be. Prior to the fulfillment ofthe local litigation requirement,
there was no contract be-tween Argentina and BG Group to be
performed. The Treaty is not such an agreement, since BG Group is
of course not a party to the Treaty. Neither the majority nor BG
Group contends that the agreement is under Article 8(2)(b), the
provision that applies “where the Contracting Party and the
investor of the other Contracting Party have so agreed.” An
arbitration agreement must be formed, and Article 8(2)(a) spells
out how an investor may do that: by submitting the dispute to local
courts for 18 months or until a decision is rendered.
Moreover, the Treaty’s
local litigation requirement certainly does not resemble “time
limits, notice, laches, estoppel,” or the other kinds of provisions
that are typically treated as conditions on the performance of an
arbitra-tion agreement, rather than prerequisites to formation.
Revised Uniform Arbitration Act of 2000 §6(c), Comment 2, 7 U.
L. A. 26 (2009). Unlike a time limit for submitting a claim to
arbitration, see Howsam v. Dean Witter Rey-nolds, Inc., 537
U. S. 79, 85 (2002) , the litigation requirement does not
simply regulate the timing of arbitration. As the majority
recognizes, ante, at 15–16, the provision does not simply require
the parties to wait for 18 months before proceeding to arbitration,
but instead requires them to submit their claims for adjudication
during that period. And unlike a mandatory pre-arbitration
grievance procedure, see John Wiley & Sons, Inc. v. Livingston, 376
U. S. 543 –559 (1964), the litigation requirement sends the parties
to court—and not just any court, but a court of the host
country.
The law of
international arbitration and domestic contract law lead to the
same conclusion: Because paragraph (2)(a) of Article 8 constitutes
only a unilateral standing offer by the Contracting Parties to each
other’s investors to submit to arbitration under certain
conditions, an investor cannot form an arbitration agreement with a
Contracting Party under the Treaty until the investor accepts the
actual terms of the Contracting Party’s offer. Absent a valid
excuse, that means litigating its dispute in the Contracting
Party’s courts to a “final decision” or, barring that, for at least
18 months.
B
The nature of the
obligations a sovereign incurs in agreeing to arbitrate with a
private party confirms that the local litigation requirement is a
condition on a signatory country’s consent to arbitrate, and not
merely a condi-tion on performance of a pre-existing arbitration
agreement. There are good reasons for any sovereign to condition
its consent to arbitrate disputes on investors’ first litigating
their claims in the country’s own courts for a specified period. It
is no trifling matter for a sovereign nation to subject itself to
suit by private parties; we do not presume that any
country—including our own—takes that step lightly. Cf. United
States v. Bormes, 568 U. S. ___, ___ (2012) (slip op., at 4)
(Congress must “unequivocally express[ ]” its intent to waive the
sovereign immunity of the United States (quoting United States v.
Nordic Village, Inc., 503 U. S. 30, 33 (1992) ; internal
quotation marks omitted)). But even where a sovereign nation has
subjected itself to suit in its own courts, it is quite another
thingfor it to subject itself to international arbitration. Indeed,
“[g]ranting a private party the right to bring an action against a
sovereign state in an international tribunal regarding an
investment dispute is a revolutionary innovation” whose “uniqueness
and power should not be over-looked.” Salacuse 137. That is so
because of both the procedure and substance of investor-state
arbitration.
Procedurally, paragraph
(3) of Article 8 designates the Arbitration Rules of the United
Nations Commission on International Trade Law (UNCITRAL) as the
default rules governing the arbitration. Those rules authorize the
Secretary-General of the Permanent Court of Arbitration at The
Hague to designate an “appointing authority” who—absent agreement
by the parties—can select the sole arbitrator (or, in the case of a
three-member tribunal, the presiding arbitrator, where the
arbitrators nominated by each of the parties cannot agree on a
presiding arbitrator). UNCITRAL Arbitration Rules, Arts. 6, 8–9
(rev. 2010 ed.). The arbitrators, in turn, select the site of the
arbitration (again, absent an agreement by the parties) and enjoy
broad discretion in conducting the proceedings. Arts. 18,
17(1).
Substantively, by
acquiescing to arbitration, a state permits private adjudicators to
review its public policies and effectively annul the authoritative
acts of its legislature, executive, and judiciary. See Salacuse
355; G. Van Harten, Investment Treaty Arbitration and Public Law
65–67 (2007). Consider the dispute that gave rise to this case:
Before the arbitral tribunal, BG Group challenged multiple
sovereign acts of the Argentine Government taken after the
Argentine economy collapsed in 2001—in particular, Emergency Law
25,561, which converted dollar-denominated tariffs into
peso-denominated tariffs at arate of one Argentine peso to one
U. S. dollar; Resolution 308/02 and Decree 1090/02, which
established a renegotiation process for public service contracts;
and Decree 214/02, which stayed for 180 days injunctions and the
execution of final judgments in lawsuits challenging the effects of
the Emergency Law. Indeed, in awarding damages to BG Group, the
tribunal held that the first three of these enactments violated
Article 2 of the Treaty. See App. to Pet. for Cert. 241a–242a,
305a.
Perhaps they did, but
that is not the issue. Under Article 8, a Contracting Party grants
to private adjudicators not necessarily of its own choosing, who
can meet literally anywhere in the world, a power it typically
reserves to its own courts, if it grants it at all: the power to
sit in judgment on its sovereign acts. Given these stakes, one
would expect the United Kingdom and Argentina to have taken
particular care in specifying the limited circumstances in which
foreign investors can trigger the Treaty’s arbitration process. And
that is precisely what they did in Article 8(2)(a), requiring
investors to afford a country’s own courts an initial opportunity
to review the country’s enactments and assess the country’s
compliance with its international obligations. Contrast this with
Article 9, which provides for arbitration between the signatory
countries of disputes under the Treaty without any preconditions.
Argentina and the United Kingdom considered arbitration with
particular foreign investors to be different in kind and to require
special limitations on its use.
The majority regards
the local litigation requirement as toothless simply because the
Treaty does not require an arbitrator to “give substantive weight
to the local court’s determinations on the matters at issue between
the parties,” ante, at 9; see also ante, at 15–16, but instead
provides that “[t]he arbitration decision shall be final and
binding on both Parties,” Art. 8(4), 1765 U. N. T. S. 38. While it
is true that an arbitrator need not defer to an Argentine court’s
judgment in an investor dispute, that does not deprive the
litigation requirement of practical import. Most significant, the
Treaty provides that an “arbitral tribunal shall decide the dispute
in accordance with . . . the laws of the Contracting
Party involved in the dispute.” Art. 8(4), ibid. I doubt that a
tribunal would give no weight to an Argentine court’s authoritative
con-struction of Argentine law, rendered in the same dispute, just
because it might not be formally bound to adopt that
interpretation.
The local litigation
requirement can also help to narrow the range of issues that remain
in controversy by the time a dispute reaches arbitration. It might
even induce the parties to settle along the way. And of course the
investor might prevail, which could likewise obviate the need for
arbitration. Cf. McKart v. United States, 395 U. S. 185, 195
(1969) .
None of this should be
interpreted as defending Argentina’s history when it comes to
international investment. That history may prompt doubt that
requiring an investor to resort to that country’s courts in the
first instance will be of any use. But that is not the question.
Argentina and the United Kingdom reached agreement on the term at
issue. The question can therefore be rephrased as whether it makes
sense for either Contracting Party to insist on resort to its
courts before being compelled to arbitrate anywhere in the world
before arbitrators not of its choosing. The foregoing reasons may
seem more compelling when viewed apart from the particular episode
before us.
II
Given that the
Treaty’s local litigation requirement is a condition on consent to
arbitrate, it follows that whether an investor has complied with
that requirement is a question a court must decide de novo,
rather than an issue for the arbitrator to decide subject only to
the most deferential judicial review. See, e.g., Adams v. Suozzi,
433 F. 3d 220, 226–228 (CA2 2005) (holding that compliance
with a condition on formation of an arbitration agreement is for a
court, rather than an arbitrator, to determine). The logic is
simple: Because an arbitrator’s authority depends on the consent of
the parties, the arbitrator should not as a rule be able to decide
for himself whether the parties have in fact consented. Where the
consent of the parties is in question, “reference of the gateway
dispute to the court avoids the risk of forcing parties to
arbitrate a matter that they may well not have agreed to
arbitrate.” Howsam, 537 U. S., at 83–84.
This principle is at
the core of our arbitration precedents. See Granite Rock Co., 561
U. S., at 299 (questions concerning “the formation of the
parties’ arbitration agreement” are for a court to decide
de novo). The same principle is also embedded in the law of
international commercial arbitration. 2 Born 2792 (“[W]here one
party denies ever having made an arbitration agreement or
challenges the validity of any such agreement, . . . the
possibility of de novo judicial review of any jurisdictional
award in an annulment action is logically necessary”). See also
Restatement (Third) of U. S. Law of International Commercial
Arbitration §4–12(d)(1) (Tent. Draft No. 2, Apr. 16, 2012) (“a
court determines de novo . . . the existence of the
arbitration agreement”).
Indeed, the question in
this case—whether BG Group accepted the terms of Argentina’s offer
to arbitrate—presents an issue of contract formation, which is the
starkest form of the question whether the parties have agreed to
arbitrate. In Howsam v. Dean Witter Reynolds, Inc., we gave two
examples of questions going to consent, which are for courts to
decide: “whether the parties are bound by a given arbitration
clause” and “whether an arbitration clause in a concededly binding
contract applies to a particular type of controversy.” 537
U. S., at 84. In both examples, there is at least a putative
arbitration agreement between the parties to the dispute. The only
question is whether the agreement is truly binding or whether it
covers the specific dispute. Here, by contrast, the question is
whether the arbitration clause in the Treaty between the United
Kingdom and Argentina gives riseto an arbitration agreement between
Argentina and BG Group at all. Cf. ante, at 2 (Sotomayor, J.,
concurring in part) (“Consent is especially salient in the context
of a bilateral investment treaty, where the treaty is not an
already agreed-upon arbitration provision between known
parties”).
The majority never even
starts down this path. Instead, it preempts the whole inquiry by
concluding that the local litigation requirement is the kind of
“procedural precondition” that parties typically expect an
arbitrator to enforce. Ante, at 8–9. But as explained, the local
litigation requirement does not resemble the requirements we have
previously deemed presumptively procedural. See supra, at 8. It
does not merely regulate the timing of arbitration. Nor does it
send the parties to non-judicial forms of dispute resolution.
More importantly, all
of the cases cited by the majority as examples of procedural
provisions involve commercial contracts between two private
parties. See ante, at 9. None of them—not a single one—involves an
agreement between sovereigns or an agreement to which the person
seeking to compel arbitration is not even a party. The Treaty, of
course, is both of those things.
The majority suggests
that I am applying “a different kind of analysis” from that
governing private commercial contracts, just because what is at
issue is a treaty. Ante, at 15. That is not so: The key point,
which the majority never addresses, is that there is no completed
agreement whatsoever between Argentina and BG Group. An agreement
must be formed, and whether that has happened is—as it is in the
private commercial contract context—an issue for a court to decide.
See supra, at 12–13.
The distinction between
questions concerning consent to arbitrate and mere procedural
requirements under an existing arbitration agreement can at times
seem elusive. Even the most mundane procedural requirement can be
recast as a condition on consent as a matter of technical logic.
But it should be clear by now that the Treaty’s local litigation
requirement is not a mere formality—not in Buenos Aires, not in
London. And while it is true that “parties often submit important
matters to arbitration,” ante, at 11, our precedents presume that
parties do not submit to arbitration the most important matter of
all: whether they are subject to an agreement to arbitrate in the
first place.
Nor has the majority
pointed to evidence that would rebut this presumption by showing
that Argentina “ ‘clearly and unmistakably’ ” intended to
have an arbitrator en-force the litigation requirement. Howsam,
supra, at 83 (quoting AT&T Technologies, Inc. v. Communications
Workers, 475 U. S. 643, 649 (1986) ). As the majority notes,
ante, at 14, the Treaty incorporates certain arbitration rules
that, in turn, authorize arbitrators to determine their own
jurisdiction over a dispute. See Art. 8(3). But those rules do not
operate until a dispute is properly before an arbitral tribunal,
and of course the whole question in this case is whether the
dispute between BG Group and Argentina was before the arbitrators,
given BG Group’s failure to comply with the 18-month local
litigation requirement. As a leading treatise has explained, “[i]f
the parties have not validly agreed to any arbitration agreement at
all, then they also have necessarily not agreed to institutional
arbitration rules.” 1 Born 870. “In these circumstances, provisions
in institutional rules cannot confer any [such] authority upon an
arbitral tribunal.” Ibid.
I also see no reason to
think that arbitrators enjoy comparative expertise in construing
the local litigation requirement. Ante, at 14. It would be one
thing if that provision involved the application of the
arbitrators’ own rules, cf. Howsam, supra, at 85, or if it were
“intertwined” with the merits of the underlying dispute, John Wiley
& Sons, 376 U. S., at 557. Neither is true of the litigation
requirement. A court can assess compliance with the requirement at
least as well as an arbitrator can. Given the structure of Article
8 and the important interests that the litigation requirement
protects, it seems clear that the United Kingdom and Argentina
thought the same.[
2]
III
Although the Court of
Appeals got there by a slightly different route, it correctly
concluded that a court must decide questions concerning the
interpretation and application of the local litigation requirement
de novo. 665 F. 3d 1363, 1371–1373 (CADC 2012). At the
same time, however, the court seems to have simply taken it for
granted that, because BG Group did not submit its dispute to the
local courts, the arbitral award in BG Group’s favor was invalid.
Indeed, the court addressed the issue in a perfunctory paragraph at
the end of its opinion and saw “ ‘only one possible
outcome’ ”: “that BG Group was required to commence a lawsuit
in Argentina’s courts and wait eighteen months before filing for
arbitration.” Id.,at 1373 (quoting Stolt-Nielsen S. A. v.
AnimalFeeds Int’l Corp., 559 U. S. 662, 677 (2010) ).
That conclusion is not
obvious. A leading treatise has indicated that “[i]t is a necessary
implication from [a uni-lateral] offer that the offeror, in
addition, makes a sub-sidiary offer by which he or she promises to
accept a tender of performance.” 1 Lord §5:14, at 1005. On this
understanding, an offeree’s failure to comply with an essential
condition of the unilateral offer “will not bar an action, if
failure to comply with the condition is due to the offeror’s own
fault.” Id., at 1005–1006.
It would be open to BG
Group to argue before the Court of Appeals that this principle was
incorporated into Article 8(2)(a) as an implicit aspect of
Argentina’s unilateral offer to arbitrate. Such an argument would
find some support in the background principle of customary
international law that a foreign individual injured by a host
country must ordinarily exhaust local remedies—unless doing so
would be “futile.” See Dugan 347–357. In any event, the issue would
be analyzed as one of contract formation, and therefore would be
for the court to decide. I would accordingly vacate the decision of
the Court of Appeals and remand the case for such an inquiry.
I respectfully
dissent.