Microsoft Corporation v. Motorola Inc, et al, No. 2:2010cv01823 - Document 931 (W.D. Wash. 2013)

Court Description: ORDER granting pltf's 927 Motion for entry of Rule 54(b) judgment by Judge James L. Robart.(RS)

Download PDF
1 2 3 4 5 6 7 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE 8 9 10 MICROSOFT CORPORATION, Plaintiff, 11 v. 12 13 Defendants. MOTOROLA MOBILITY, INC., et al., 16 Plaintiffs, 17 18 v. MICROSOFT CORPORATION, 19 20 21 ORDER GRANTING MOTION FOR ENTRY OF RULE 54(b) JUDGMENT MOTOROLA, INC., et al., 14 15 CASE NO. C10-1823JLR Defendant. This matter is before the court on Microsoft Corporation’s (“Microsoft”) motion for final judgment pursuant to Federal Rule of Civil Procedure 54(b). (Mot. 22 ORDER- 1 1 (Dkt. # 927).) The court has reviewed the parties’ submissions, the balance of the record, 2 and the applicable law. Being fully advised, the court GRANTS Microsoft’s motion for 3 entry of a Rule 54(b) judgment. 4 5 I. FACTS Microsoft filed suit (“the contract action”) against Motorola, Inc., Motorola 6 Mobility, Inc., and General Instrument Corporation (collectively, “Motorola”) in this 7 court on November 9, 2010. (Compl. (Dkt. # 1).) Microsoft alleged that Motorola had 8 an obligation to license certain standard-essential patents to Microsoft at a reasonable and 9 non-discriminatory (“RAND”) rate and that Motorola had breached its RAND 10 obligations.1 (Id.) Specifically, Microsoft brought four claims: breach of contract, 11 promissory estoppel, waiver, and a request for a declaratory judgment that Motorola’s 12 offer letters did not comply with its RAND obligations. (Id.; see also Am. Compl. (Dkt. 13 # 53).) Motorola asserted two counterclaims, requesting (1) a declaratory judgment that 14 Motorola’s conduct did not breach its RAND obligations, and (2) a declaratory judgment 15 that Microsoft had repudiated the benefits of Motorola’s RAND statements and that 16 Motorola was entitled to seek an injunction against Microsoft on the patents underlying 17 the RAND claims. (Ans. (Dkt. # 192).) 18 Motorola filed suit (“the patent action”) against Microsoft in the Western District 19 of Wisconsin on November 10, 2010, alleging that Microsoft infringed three of the 20 patents underlying Microsoft’s RAND claims in the contract action. (See C11-343JLR 21 1 For a more detailed discussion of the procedural and substantive background of this 22 case, see generally the court’s February 27, 2012 order (Dkt. # 188). ORDER- 2 1 Dkt. (Wis. Dkt.) # 29.) In addition to counterclaims that Motorola infringed two 2 Microsoft patents, Microsoft raised four counterclaims that mirrored the claims it brought 3 in the contract action. (Wis. Dkt. # 37.) In response, Motorola reiterated the same two 4 declaratory judgment counterclaims it had raised in the contract action and added 5 counterclaims for non-infringement and invalidity of Microsoft’s patents. (Dkt. # 67). 6 The patent action was transferred to this court on February 8, 2011, and was consolidated 7 with the contract action on June 1, 2011. (Wis. Dkt. # 44; 6/1/11 Order (Dkt. # 66) at 98 11.) 9 This court dismissed Microsoft’s claims in the contract action (and counterclaims 10 in the patent action) for waiver and for a declaratory judgment that Motorola breached its 11 RAND obligations, finding that they were cumulative of Microsoft’s first two claims in 12 the contract action. (6/1/11 Order at 7.) The court also dismissed Motorola’s 13 counterclaim in the contract action for a declaratory judgment that Motorola was entitled 14 to seek injunctive relief, holding that this issue would be fully litigated by Motorola’s 15 demand for injunctive relief in the patent action.2 (2/6/12 Order (Dkt. # 175) at 11-12.) 16 Lastly, the court granted summary judgment against Motorola’s counterclaim in the 17 contract action for a declaratory judgment that Microsoft had repudiated Motorola’s 18 RAND obligations. (8/12/13 Order (Dkt. # 843) at 19-20.) 19 On July 16, 2012, the court granted the parties’ joint motion to stay all related 20 patent-infringement claims and cases pending determination of the RAND claims. 21 2 The court later dismissed without prejudice Motorola’s request for injunctive relief in 22 the patent action. (See 11/30/12 Order (Dkt. # 607).) ORDER- 3 1 (7/16/12 Order (Dkt. # 360).) In November 2012, the court held a bench trial to 2 determine the RAND royalty rates and ranges for Motorola’s relevant standard-essential 3 patent portfolios. (See Dkt. ## 629-32.) The court issued Findings of Fact and 4 Conclusions of Law setting the RAND rates and ranges on April 19, 2013. (RAND 5 Findings (Dkt. ## 673 (sealed), 681 (redacted).) Starting August 26, 2013, a jury trial 6 was held on Microsoft’s breach of contract claim. (See Dkt. ## 876, 880, 883, 892, 895, 7 899, 907.) The jury returned a verdict for Microsoft, finding that Motorola had 8 “breached its contractual commitment” to two standard-setting organizations and 9 awarding Microsoft damages of $11,492,686.00 and attorneys fees and costs of 10 $3,031,720.00. (Jury Verdict (Dkt. # 909).) 11 On September 25, 2013, Microsoft brought this motion for entry of final judgment 12 on the breach of contract claim. (See Mot.) Motorola opposes this motion unless the 13 court also enters final judgment on “all RAND-related claims and counterclaims” in both 14 the contract action and the patent action. (Resp. (Dkt. # 929) at 5, 8). 15 II. ANALYSIS 16 A. Legal Standards 17 A court “may direct entry of a final judgment as to one or more, but fewer than all, 18 claims or parties only if the court expressly determines that there is no just reason for 19 delay.” Fed. R. Civ. P. 54(b). The Supreme Court has enumerated a two-part test for 20 determining whether a court may enter a final judgment pursuant to Rule 54(b). Curtiss21 Wright Corp. v. Gen. Elec. Co., 446 U.S. 1, 7-10 (1980). First, the court must determine 22 that it is dealing with a final judgment. Id. at 7. “It must be a judgment in the sense that ORDER- 4 1 it is a decision upon a cognizable claim for relief, and it must be final in the sense that it 2 is an ultimate disposition of an individual claim entered in the course of a multiple claims 3 action.” Id. (internal quotations omitted). In determining finality, courts “evaluate such 4 factors as the interrelationship of the claims so as to prevent piecemeal appeals.” 5 AmerisourceBergen Corp. v. Dialysist W., Inc., 465 F.3d 946, 954 (9th Cir. 2006). 6 Second, the court must determine whether there is any just reason for delay. 7 Curtiss-Wright, 446 U.S. at 8. Entry of judgment under Rule 54(b) “is proper if it will 8 aid expeditious decision of the case.” Texaco, Inc. v. Ponsoldt, 939 F.2d 794, 797 (9th 9 Cir. 1991). “It is left to the sound judicial discretion of the district court to determine the 10 appropriate time when each final decision in a multiple claims action is ready for appeal.” 11 Curtiss-Wright, 446 U.S. at 8. The Ninth Circuit embraces a “pragmatic approach 12 focusing on severability and efficient judicial administration.” Wood v. GCC Bend, LLC, 13 422 F.3d 873, 880 (9th Cir. 2005). Accordingly, courts consider (1) whether the claims 14 under review are separable from the others remaining to be adjudicated; and (2) whether 15 the nature of the claims already determined is such that no appellate court would have to 16 decide the same issues more than once. See Curtiss-Wright, 446 U.S. at 7-10. 17 However, even claims that are not separate and independent from the remaining 18 claims may be certified for appeal, “so long as resolving the claims would streamline the 19 ensuing litigation.” Noel v. Hall, 568 F.3d 743, 747 (9th Cir. 2009) (quoting Texaco, 939 20 F.2d at 798). If there is factual overlap between claims, certification of some of the 21 claims may be appropriate if “the case is complex and there is an important or controlling 22 legal issue that cuts across (and cuts out or at least curtails) a number of claims.” U.S. ORDER- 5 1 Fid. & Guar. Co. v. Lee Investments LLC, 641 F.3d 1126, 1140 (9th Cir. 2011) (quoting 2 Wood, 422 F.3d at 881). 3 B. The Court’s RAND Findings, Microsoft’s Breach of Contract Claim, and Motorola’s Repudiation Counterclaim 4 For the following reasons, the court directs entry of a final judgment on (1) the 5 court’s April 19, 2013, Findings of Fact and Conclusions of Law regarding RAND 6 royalty rates and ranges, (2) Microsoft’s breach of contract claim, and (3) Motorola’s 7 counterclaim that Microsoft repudiated the benefits of Motorola’s RAND statements. 8 Under the first prong of the test, the contract claim and the repudiation 9 counterclaim each constitute a final judgment. The jury rendered a verdict on the breach 10 of contract claim after a seven-day trial. (See Jury Verdict.) Breach of contract is a 11 cognizable claim for relief, and the jury’s verdict is the ultimate disposition of this 12 individual claim. (See also 9/24/13 Order (Dkt. # 926) (denying Motorola’s motion for 13 judgment as a matter of law).) Similarly, the court granted summary judgment that 14 Microsoft had not repudiated its rights to a RAND license. (See 8/12/13 Order at 19-20.) 15 A request for a declaratory judgment that a party has repudiated a contract is a cognizable 16 claim for relief, and the court’s summary judgment holding is the ultimate disposition of 17 this individual claim. Moreover, the contract and repudiation claims are separate and 18 independent from the outstanding patent and RAND claims: any subsequent decision by 19 this court on the outstanding claims will not affect the disposition of the contract and 20 repudiation claims. See AmerisourceBergen, 465 F.3d at 954 (upholding Rule 54(b) 21 22 ORDER- 6 1 judgment because any subsequent judgments on remaining claims would not vacate the 2 court’s judgment on the claim to be appealed). 3 The court’s RAND royalty determination, while perhaps not strictly a “cognizable 4 claim for relief” in and of itself, is an integral element of Microsoft’s breach of contract 5 claim. (See 10/10/12 Order (Dkt. # 465) at 20 (explaining that, in order to decide 6 Microsoft’s breach of contract claim, the jury would need a benchmark RAND range to 7 compare to Motorola’s offers).) The court’s Findings of Fact and Conclusions of Law 8 are the ultimate disposition of this issue. (See RAND Findings.) Presumably, directing 9 entry of final judgment on the jury verdict on the contract claim would serve to make the 10 RAND determination available for appellate review. Nonetheless, out of an abundance 11 of caution, as well as a desire to forestall confusion among the parties and to avoid 12 further delay, the court also directs entry of final judgment on the court’s RAND royalty 13 determination. 14 Under the second prong of the test, there is no just reason to delay appeal of these 15 claims. As discussed above, the contract claim, repudiation counterclaim, and RAND 16 royalty determination are severable from the remaining patent and RAND claims and 17 counterclaims. A final judgment on these three claims raises no danger that a court will 18 have to decide the same issues twice. 19 Moreover, certifying these three claims for appeal serves the purposes of judicial 20 efficiency. The RAND royalty issue is central to the parties’ dispute, such that resolution 21 of this issue could very well make it unnecessary to address some of the remaining 22 claims. Indeed, it was for this same reason that the parties previously agreed to stay all ORDER- 7 1 patent-infringement related claims and counterclaims and to allow the parties to 2 “concentrate their efforts on the RAND license issues.” (Joint Mot. to Stay (Dkt. # 355) 3 at 2.) This stay remains in effect, with the result that a considerable amount of the patent 4 infringement litigation is incomplete (for example, claim construction is still unfinished). 5 Additionally, as discussed in Section II(C), final judgment could also expedite decision 6 on the remaining RAND claims. Under Lee Investments, certification of some claims 7 with overlapping facts is appropriate if “the case is complex and there is an important or 8 controlling legal issue that cuts across (and cuts out or at least curtails) a number of 9 claims.” 641 F.3d at 1140. That is exactly the situation the parties face here. 10 Finally, although Microsoft only moved for certification on the breach of contract 11 claim, Motorola requested certification of the repudiation counterclaim in its response. 12 (See Resp. at 7-8.) Microsoft’s contract claim and Motorola’s repudiation counterclaim 13 are two sides of the same coin: Microsoft argues that Motorola owes and has breached 14 certain RAND obligations, and Motorola argues that Microsoft’s actions divest Microsoft 15 of the benefits of those RAND obligations. To avoid piecemeal appeals, the court agrees 16 that it is appropriate for both claims to be decided at the same time. 17 Accordingly, the court expressly determines that there is no just reason for delay, 18 and directs entry of final judgment on (1) the court’s RAND rate determination, (2) 19 Microsoft’s breach of contract claim, and (3) Motorola’s repudiation counterclaim. 20 C. Motorola’s Opposition 21 Motorola opposes Microsoft’s motion unless the court also enters final judgment 22 on “all RAND-related claims and counterclaims” in both the contract action and the ORDER- 8 1 patent action. (Resp. at 5, 8). As discussed above, the court agrees that the breach of 2 contract claim and repudiation counterclaim should be included in the court’s Rule 54(b) 3 final judgment. However, Motorola’s position as to the remaining claims is 4 insupportable for three reasons. 5 First, it is unnecessary to certify both the RAND claims in the contract action and 6 the RAND claims in the parallel patent action. (See Resp. at 7-8 (arguing for certification 7 of the patent action RAND claims and counterclaims).) The contract action and the 8 patent action have been consolidated for all purposes. (See 6/1/11 Order at 9-11.) The 9 court has already found that the RAND claims and counterclaims raised in both actions 10 are “substantially” the same. (2/27/12 Order (Dkt. # 188) at 6-7.) Inasmuch as the 11 RAND aspects of these actions are redundant, each claim or counterclaim need only be 12 decided once; after appeal, the mirror image claim or counterclaim can be dismissed as 13 moot or otherwise disposed of. Accordingly, the court declines to certify any of the 14 duplicative RAND claims in the patent action. 15 Second, the court cannot direct entry of final judgment regarding claims on which 16 the court has not previously rendered a final decision. See Curtiss-Wright, 446 U.S. at 7. 17 Motorola argues that the court should first “dismiss” and then “deem final” Microsoft’s 18 promissory estoppel claim and Motorola’s counterclaim for a declaratory judgment that 19 Motorola’s conduct did not violate its RAND obligations. (Resp. at 7-8.) Motorola 20 provides no indication as to how the court can simply “dismiss” these claims at this stage. 21 In fact, as Motorola’s request for dismissal implies, neither the jury nor the court has 22 made any final ruling on the merits of these two claims. (See 3/14/13 Hr’g Tr. ORDER- 9 1 (Dkt. # 675) at 4 (limiting jury trial to the breach of contract claim); 2/6/12 Order at 2 11(denying summary judgment motion against Motorola’s RAND declaratory judgment 3 counterclaim).) Lacking final judgments, these claims fail to meet prong one of the 4 Curtiss-Wright test, and, as such, are ineligible for Rule 54(b) certification. 5 Neither of these claims, however, precludes certification of the breach of contract 6 claim or repudiation claim. Promissory estoppel is an alternative theory of recovery 7 currently rendered moot by the jury’s verdict on breach of contract. And the court has 8 already held that Motorola’s declaratory judgment counterclaim is broader than 9 Microsoft’s affirmative claim for breach of contract because the latter is predicated on 10 Microsoft’s two offer letters only. (See 2/6/12 Order at 7-8.) Therefore, an appeal on the 11 breach of contract claim and repudiation claim may make it unnecessary to address both 12 of these claims. As set forth in Noel, certification of claims with overlapping facts is 13 appropriate “so long as resolving the claims would streamline the ensuing litigation.” 14 568 F.3d at 747. 15 Third, Motorola has not shown that there is no just reason to delay certifying the 16 remaining RAND claims and counterclaim, or that these remaining claims otherwise 17 preclude certification of the breach of contract and repudiation claims. Motorola argues 18 that the court should enter final judgment on Microsoft’s waiver claim, Microsoft’s 19 request for a declaratory judgment that Motorola’s offer letters did not comply with its 20 RAND obligations, and Motorola’s request for a declaratory judgment that Motorola was 21 entitled to seek an injunction against Microsoft on the patents underlying the RAND 22 claims. (Resp. at 6-7.) The court dismissed Microsoft’s waiver and declaratory judgment ORDER- 10 1 claims as cumulative of Microsoft’s other claims. (See 6/1/11 Order at 7 (“During oral 2 argument, Microsoft conceded that its waiver claim is part and parcel to its breach of 3 contract and promissory estoppels claims.”); id. at 8-9.) The court dismissed Motorola’s 4 declaratory judgment claim regarding injunctive relief for a similar reason, finding that 5 the issue would be fully litigated by Motorola’s demand for injunctive relief in the patent 6 action.3 (2/6/12 Order at 11-12.) 7 To the extent these three claims are cumulative of the breach of contract and 8 repudiation claims, they will be addressed fully on appeal, and to the extent they are not 9 cumulative, they may be rendered moot by the result of the appeal. Moreover, as 10 discussed above, the crux of the parties’ dispute is the extent of Motorola’s RAND 11 obligations. The breach of contract claim and repudiation counterclaim go to the heart of 12 this issue. The court, exercising its discretion as a “‘dispatcher’ to determine the 13 appropriate time when each final decision in a multiple claims action is ready for appeal,” 14 determines that there is no reason to muddy the waters on appeal by adding these three 15 claims. See Curtiss-Wright, 446 U.S. at 8. In order to expedite the litigation, the court 16 certifies final judgment on Microsoft’s breach of contract claim, Motorola’s repudiation 17 counterclaim, and the court’s RAND royalty determination only. 18 19 3 The court later dismissed without prejudice Motorola’s request for injunctive relief in the patent action. (See 11/30/12 Order.) The court specified that this determination was “based 21 on the specific circumstances and rulings that have developed in this litigation,” and that if, “in the future, those circumstances change in a manner to warrant injunctive relief, Motorola may at that time seek such relief.” (Id. at 15.) Because this dismissal is not a final judgment, it is not 22 eligible for Rule 54(b) certification. 20 ORDER- 11 1 2 III. CONCLUSION For the foregoing reasons, the court GRANTS Microsoft’s motion for entry of 3 final judgment pursuant to Federal Rule of Civil Procedure 54(b) (Dkt. # 927). The court 4 DIRECTS that the September 4, 2013, jury verdict (Dkt. # 909) shall be deemed a final 5 judgment pursuant to Federal Rule of Civil Procedure 54(b). The court also ORDERS 6 that Microsoft recover on its breach of contract claim in the amount of $14,524,406.00, 7 with post-judgment interest pursuant to 28 U.S.C § 1961.4 8 In addition, the court DIRECTS that its April 19, 2013, Findings of Fact and 9 Conclusions of Law (Dkt. ## 673 (sealed), 681 (redacted)) shall be deemed a final 10 judgment pursuant to Federal Rule of Civil Procedure 54(b). The court also DIRECTS 11 that its August 12, 2013, order on summary judgment (Dkt. # 843) shall be deemed a 12 final judgment pursuant to Federal Rule of Civil Procedure 54(b) with respect to the 13 ruling on Motorola’s repudiation counterclaim only. 14 Dated this 12th day of November, 2013. 15 17 A 18 JAMES L. ROBART United States District Judge 16 19 20 21 4 Regarding costs, Microsoft may file a bill of costs to be reviewed by the court. See Fed. 22 R. Civ. P. 54(d)(1). ORDER- 12

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.