POSCO v. United States, No. 16-00227 (Ct. Int'l Trade 2022)

Annotate this Case

This opinion or order relates to an opinion or order originally issued on September 11, 2018.

Download PDF
Slip Op. 22-65 UNITED STATES COURT OF INTERNATIONAL TRADE POSCO, Plaintiff, and NUCOR CORPORATION, Consolidated Plaintiff, v. UNITED STATES, Before: Jennifer Choe-Groves, Judge Defendant, Consol. Court No. 16-00227 and STEEL DYNAMICS, INC., AK STEEL CORPORATION, ARCELORMITTAL USA LLC, NUCOR CORPORATION, UNITED STATES STEEL CORPORATION, POSCO, HYUNDAI STEEL COMPANY, and GOVERNMENT OF KOREA, Defendant-Intervenors. OPINION [Sustaining the U.S. Department of Commerce’s second remand determination following a countervailing duty investigation of certain hot-rolled steel flat products from the Republic of Korea.] Dated: June 13, 2022 Consol. Court No. 16-00227 Page 2 Donald B. Cameron, Julie C. Mendoza, R. Will Planert, Brady W. Mills, Mary S. Hodgins, and Eugene Degnan, Morris, Manning & Martin LLP, of Washington, D.C., for Plaintiff and Defendant-Intervenor POSCO and Defendant-Intervenors Hyundai Steel Company and the Government of Korea. Alan H. Price, Christopher B. Weld, and Adam M. Teslik, Wiley Rein LLP, of Washington, D.C., for Consolidated Plaintiff and Defendant-Intervenor Nucor Corporation. Patricia M. McCarthy, Assistant Director, Commercial Litigation Branch, Civil Division, U.S. Department of Justice, of Washington, D.C., for Defendant United States. With her on the brief were Brian M. Boynton, Acting Assistant Attorney General, and Jeanne E. Davidson, Director. Of counsel was Hendricks Valenzuela, Attorney, Office of the Chief Counsel for Trade Enforcement & Compliance, U.S. Department of Commerce. Kathleen W. Cannon and R. Alan Luberda, Kelley Drye & Warren LLP, of Washington, D.C., for Defendant-Intervenor ArcelorMittal USA LLC. Stephen A. Jones and Daniel L. Schneiderman, King & Spalding LLP, of Washington, D.C., for Defendant-Intervenor AK Steel Corporation. Thomas M. Beline and Sarah E. Shulman, Cassidy Levy Kent (USA) LLP, of Washington, D.C., for Defendant-Intervenor United States Steel Corporation. Choe-Groves, Judge: Plaintiff POSCO (“POSCO”) and Consolidated Plaintiff Nucor Corporation (“Nucor”) initiated this action contesting various aspects of the final determination in a countervailing duty investigation, in which the U.S. Department of Commerce (“Commerce”) determined that countervailable subsidies are being provided to producers and exporters of certain hot-rolled steel flat products from the Republic of Korea (“Korea”). See Countervailing Duty Investigation of Certain Hot-Rolled Steel Flat Products from the Republic of Korea, 81 Fed. Reg. 53,439 (Dep’t of Commerce Aug. 12, 2016) (final affirmative Consol. Court No. 16-00227 Page 3 determination), as amended, Certain Hot-Rolled Steel Flat Products from Brazil and the Republic of Korea, 81 Fed. Reg. 67,960 (Dep’t of Commerce Oct. 3, 2016) (am. final affirmative countervailing duty determination and countervailing duty order); see also Issues and Decision Mem. for the Final Determination in the Countervailing Duty Investigation of Certain Hot-Rolled Steel Flat Products from the Republic of Korea (Aug. 4, 2016) (“Final IDM”), PR 444. Before the Court are the Final Results of Redetermination Pursuant to Court Remand, ECF No. 125-1 (“Second Remand Determination”), which the Court ordered following the U.S. Court of Appeals for the Federal Circuit’s opinion in a related appeal, POSCO v. United States (“CAFC POSCO”), 977 F.3d 1369 (Fed. Cir. 2020), and the order in the appeal of this case vacating this Court’s decision and remanding, Order (Mar. 4, 2021) (“CAFC Remand Order”), ECF No. 123. Only Nucor and Defendant United States (“Defendant”) filed comments to the Second Remand Determination. Nucor Corporation’s Comments Opp’n Final Results Redetermination Pursuant Court Remand (“Nucor’s Cmts.”), ECF Nos. 127, 128; Def.’s Resp. Comments Second Remand Redetermination (“Def.’s Resp.”), ECF No. 130. For the reasons discussed below, the Court sustains the Second Remand Determination. BACKGROUND The Court presumes familiarity with the facts and procedural history of this Consol. Court No. 16-00227 Page 4 case and recounts the facts relevant to the Court’s review of the Second Remand Determination. See POSCO v. United States, 42 CIT __, __, 337 F. Supp. 3d 1265, 1270–72 (2018); POSCO v. United States, 43 CIT __, __, 378 F. Supp. 3d 1348, 1351–52 (2019). Nucor, AK Steel Corporation, ArcelorMittal USA LLC, Steel Dynamics Inc., and United States Steel Corporation filed a petition (“Petition”) with Commerce concerning imports of hot-rolled steel flat products from Korea. See Decision Mem. for the Prelim. Negative Determination: Countervailing Duty Investigation of Certain Hot-Rolled Steel Flat Products from the Republic of Korea (Jan. 8, 2015) (“Prelim. IDM”) at 1, PR 298. Commerce initiated a countervailing duty investigation into certain hot-rolled steel flat products from Korea, with a period of investigation covering calendar year 2014. See id. at 1, 3; see also Certain Hot-Rolled Steel Flat Products from Brazil, the Republic of Korea, and Turkey, 80 Fed. Reg. 54,267 (Dep’t of Commerce Sept. 9, 2015) (initiation of countervailing duty investigations). The investigation named POSCO and Hyundai Steel Co., Ltd. (“Hyundai Steel”) as the two mandatory respondents. See Prelim. IDM at 2. Commerce issued an initial questionnaire to the Government of Korea, seeking information about how electricity prices in Korea are set and how the Korean Electric Power Corporation’s (“KEPCO”) costs are reflected in its electricity rates. See Investigation of Certain Hot-Rolled Steel Consol. Court No. 16-00227 Page 5 Flat Products from the Republic of Korea: Countervailing Duty Questionnaire (Sept. 24, 2015) (“Govt. of Korea Initial Questionnaire”), PR 46–47. The Government of Korea responded. Countervailing Duty Investigation: Certain Hot-Rolled Steel Flat Products (Hot-Rolled Steel) from the Republic of Korea: Resp. (Nov. 4, 2015) (“Govt. of Korea’s Initial Questionnaire Response”), PR 112–172, 175–201. Commerce conducted verifications of the questionnaire responses submitted by the Government of Korea, POSCO, and Hyundai Steel. See Final IDM at 2. In the Final Determination, Commerce determined that the Government of Korea’s provision of electricity did not benefit POSCO or Hyundai Steel, was not for less than adequate remuneration, and was not countervailable. See id. at 25, 44–50. In a related appeal, the U.S. Court of Appeals for the Federal Circuit vacated and remanded “[b]ecause Commerce improperly based its benefit-conferred analysis on a ‘preferential price’ standard” contrary to the law and Commerce’s failure to investigate the Korean Power Exchange (the “KPX”) and include “[the] KPX’s generation costs in its analysis render[ed] its final determination unsupported by substantial evidence.” CAFC POSCO, 977 F.3d at 1378 (discussing Countervailing Duty Investigation of Certain Cold-Rolled Steel Flat Products from the Republic of Korea, 81 Fed. Reg. 49,943 (Dep’t of Commerce July 29, 2016) (final affirmative determination), as amended, Certain Cold-Rolled Consol. Court No. 16-00227 Page 6 Steel Flat Products from Brazil, India, and the Republic of Korea (“CAFC POSCO Final Determination”), 81 Fed. Reg. 64,436 (Dep’t of Commerce Sept. 20, 2016) (am. final affirmative countervailing duty determination and countervailing duty order). In the appeal of this case, the U.S. Court of Appeals for the Federal Circuit vacated and remanded consistent with its decision in CAFC POSCO. CAFC Remand Order at 2. This Court remanded to Commerce for further proceedings. Order (Mar. 8, 2021), ECF No. 124. JURISDICTION AND STANDARD OF REVIEW The Court has jurisdiction pursuant to Section 516A(a)(2)(B)(i) of the Tariff Act of 1930, as amended, 19 U.S.C. § 1516a(a)(2)(B)(i), and 28 U.S.C. § 1581(c). The Court will hold unlawful any determination found to be unsupported by substantial evidence on the record or otherwise not in accordance with the law. 19 U.S.C. § 1516a(b)(1)(B)(i). The Court also reviews determinations made on remand for compliance with the Court’s remand order. Ad Hoc Shrimp Trade Action Comm. v. United States, 38 CIT __, __, 992 F. Supp. 2d 1285, 1290 (2014), aff’d, 802 F.3d 1339 (Fed. Cir. 2015). DISCUSSION The U.S. Court of Appeals for the Federal Circuit remanded two issues: (1) reliance on a preferential-rate standard as contrary to the law and (2) failure to address the KPX’s impact on the Korean electricity market as rendering Consol. Court No. 16-00227 Page 7 Commerce’s cost-recovery analysis unsupported by substantial evidence. CAFC Remand Order; see also CAFC POSCO, 977 F.3d at 1376, 1378. Section 1677(5) defines a countervailable subsidy as a financial contribution provided by an authority (a foreign government or public entity) to a specific industry when a recipient within the industry receives a benefit as a result of that contribution. See 19 U.S.C. § 1677(5); see also Fine Furniture (Shanghai) Ltd. v. United States, 748 F.3d 1365, 1369 (Fed. Cir. 2014). Before the statute was revised by the Uruguay Round Agreements Act (“URAA”), Pub. L. No. 103-465, § 101, 108 Stat. 4809, 4814 (codified as 19 U.S.C. § 3511 (1994)), Commerce applied the preferentiality standard, under which Commerce determined that a benefit was conferred if goods or services were provided “at preferential rates.” See CAFC POSCO, 977 F.3d at 1371 (citing 19 U.S.C. § 1677(5)(A)(ii)(II) (1988)). The URAA “replaced” the preferentiality standard with the less-thanadequate-remuneration standard. Id. at 1376 (citing URAA, Statement of Administrative Action, H.R. Doc. No. 103-316, vol. 1, at 927 (1994), reprinted in 1994 U.S.C.C.A.N. 4040, 4209). Under the current law, “a benefit shall normally be treated as conferred . . . if [] goods or services are provided for less than adequate remuneration.” 19 U.S.C. § 1677(5)(E), (E)(iv); see CAFC POSCO, 977 F.3d at 1371. “For purposes of clause (iv), adequacy of remuneration [is] determined in relation to prevailing market conditions for the good or service being Consol. Court No. 16-00227 Page 8 provided . . . in the country which is subject to the investigation or review. Prevailing market conditions include price, quality, availability, marketability, transportation, and other conditions of purchase or sale.” 19 U.S.C. § 1677(5)(E). Commerce codified its three-tiered, hierarchical approach for determining the adequacy of remuneration of an investigated good or service. See 19 C.F.R. § 351.511. The relevant tier in this case, the third tier, provides that when no world market price is available, “[Commerce] will normally measure the adequacy of remuneration by assessing whether the government price is consistent with market principles.” Id. at § 351.511(a)(2)(iii). Commerce makes this determination based on “information from the foreign government about how it sets its price.” Fine Furniture, 748 F.3d at 1370. “[I]f Commerce determines that government pricing is not consistent with market principles, then ‘a benefit shall normally be treated as conferred.’” CAFC POSCO, 977 F.3d at 1372 (quoting 19 U.S.C. § 1677(5)(E)(iv)). I. Adequate Remuneration The U.S. Court of Appeals for the Federal Circuit held in CAFC POSCO that Commerce’s application of the pre-URAA preferential-rate standard was contrary to the law. 977 F.3d at 1376. The CAFC POSCO court concluded that “Commerce’s analysis [] turned on whether respondents were given preferential treatment” based on the following in Commerce’s issues and decision Consol. Court No. 16-00227 Page 9 memorandum in that case: “If the rate charged is consistent with the standard pricing mechanism and the company under investigation is, in all other respects, essentially treated no differently than other companies and industries which purchase comparable amounts of electricity, then there is no benefit.” Id. at 1374 (quoting Issues and Decision Mem. for the Final Determination in the Countervailing Duty Investigation of Certain Cold-Rolled Steel Flat Products from the Republic of Korea, C-580-882 (July 20, 2016) (“CAFC POSCO Final IDM”) at 46. The court explained that “Commerce cannot rely on price discrimination to the exclusion of a thorough evaluation of fair-market principles to determine whether a recipient is receiving an unlawful benefit.” Id. at 1376 (citing Nucor Corp. v. United States, 927 F.3d 1243, 1251 (Fed. Cir. 2019)). Commerce used the same standard in the Final Determination in this case as in the final determination reviewed in CAFC POSCO. Compare Final IDM at 44– 49, 45 (“If the rate charged is consistent with the standard pricing mechanism and the company under investigation is, in all other respects, essentially treated no differently than other companies and industries which purchase comparable amounts of electricity, then there is no benefit.”), with CAFC POSCO Final IDM at 45–50. In the Second Remand Determination, Commerce defended its standard from the Final Determination. Consol. Court No. 16-00227 Page 10 Even after determining that the industrial tariffs charged by KEPCO are set at rates that cover cost and provide a rate of return, a rate could nevertheless represent [less than fair value] if a respondent company consumed electricity with a contract demand of between 4kW and 300kW and at a voltage of 220V–380V but was charged the lower tariff applicable to industrial companies that had a contract demand of over 300kW and consumed electricity at a voltage of 345,000V or higher. This is the meaning of the phrase in the Final Determination, “essentially treated no differently than other companies which purchase comparable amounts of electricity.” Second Remand Determination at 16–17. [T]he statement in the Final Determination referenced by both Nucor and the CAFC indicates that when the rate charged is consistent with the standard pricing mechanism (in this case, the electricity tariffs charged to the respondent covers cost plus a return) and the respondent is treated no differently than other companies that purchase comparable amounts of electricity (in this case, the rate charged to the respondent is from the correct tariff classification based on its contract demand for electricity and voltage for that electricity consumption, as this is a market condition for the provision of electricity in Korea), there is no benefit . . . . Id. at 31. Because the Court of Appeals held unlawful Commerce’s standard in the Final Determination, CAFC POSCO, 977 F.3d at 1376, the Court does not consider Commerce’s argument as properly before the Court in the instant case. The Court focuses instead on Commerce’s analysis as re-articulated on second remand: [I]f the tariff charged to the respondent does not cover “cost of production” plus “a profitable return on the investment” . . . , then the respondent has received a countervailable benefit under section [1677(5)(E)] of the Act. Moreover, even in the event that the tariff charged to the respondent covers “costs of production” plus “a profitable return on the investment,” there is still a countervailable Consol. Court No. 16-00227 Page 11 benefit conferred under the statute if KEPCO charges the respondent less than what it should be charged under its designated tariff classification. Second Remand Determination at 31; see also id. at 15–16; Def.’s Resp. at 5–8. Nucor agrees that Commerce’s re-stated methodology, “[a] government price that covers the cost of production and supply, plus an appropriate amount for profit, and that is not otherwise less than the respondent should be charged,” is consistent with the statutory adequate-remuneration standard and CAFC POSCO. Nucor’s Cmts. at 4–5 (quoting Second Remand Determination at 31). Adequate remuneration is tied to fair value, Nucor, 927 F.3d at 1252–53, as are “market principles of cost or pricing structures,” id. at 1253 (emphasis omitted) (quoting 19 U.S.C. § 1677(18) (defining nonmarket economy country)). The Court of Appeals has upheld an adequate-remuneration determination based on “familiar standards of cost recovery.” Nucor, 927 F.3d at 1254. Commerce’s methodology of determining whether KEPCO’s tariff schedule covers costs and whether the respondents were charged the appropriate rate according to the tariff schedule is a reasonable measure of the adequacy of remuneration under the regulatory third tier in assessing whether the rate that KEPCO charged the respondents is consistent with market principles, see 19 C.F.R. § 351.511(a)(2)(iii), because it is based on cost recovery, see Nucor, 927 F.3d at 1254. As in Nucor, no argument was raised about any conceptual difference between market value and cost recovery. See id. Consol. Court No. 16-00227 Page 12 at 1255. The Second Remand Determination standard is also consistent with CAFC POSCO. The CAFC POSCO court faulted Commerce for relying on price discrimination, namely “that [a] producer is being discriminatorily favored compared to others in the exporting country.” CAFC POSCO, 977 F.3d at 1376 (quoting Nucor, 927 F.3d at 1251). Excluding its defense of the Final Determination standard, which is not before the Court, Commerce re-articulated its standard without the language “treated no differently than other companies,” which the CAFC POSCO court held was an unlawful preferential-rate standard. See id. at 1374–76. The Court notes Commerce’s assertion that “in assessing the price charged for electricity by KEPCO to the respondents, [it] did not compare the price charged to other customers in Korea.” Second Remand Determination at 14; see also Def.’s Resp. at 8. Commerce removed the offending preferential-rate language and did not conduct a price-discrimination analysis. The Court concludes that Commerce’s re-articulated standard is in accordance with the law. II. Cost Recovery The U.S. Court of Appeals for the Federal Circuit concluded in CAFC POSCO that “Commerce’s determination that [the] KPX was not relevant to its analysis leaves unresolved whether a benefit was conferred by way of the price Consol. Court No. 16-00227 Page 13 charged by [the] KPX to KEPCO.” CAFC POSCO, 977 F.3d at 1377 (citations omitted). The CAFC POSCO court held that Commerce failed to discharge its “affirmative duty to investigate any appearance of subsidies related to the investigation that are discovered during an investigation,” id. at 1378 (citing 19 U.S.C. § 1677d and Allegheny Ludlum Corp. v. United States, 24 CIT 452, 112 F. Supp. 2d 1141 (2000)), by not considering the KPX in its cost-recovery analysis when the “KPX is an authority” and the record showed that all electricity generated in Korea must be sold to KEPCO by the KPX; KEPCO and its six subsidies wholly own the KPX; and KEPCO sets its prices based on the cost of purchasing electricity from the KPX, which accounts for up to 90% of KEPCO’s total costs, id. at 1377–78 (citing Nucor, 927 F.3d at 1259 (Reyna, J., dissenting)). In the CAFC POSCO court’s words, “[t]hat [the] KPX’s pricing constitutes a significant portion of KEPCO’s total cost makes it implausible that Commerce adequately investigated Korea’s prevailing market condition for electricity without a thorough understanding of the costs associated with generating and acquiring that electricity.” Id. at 1377. The CAFC POSCO court held that “Commerce’s failure to investigate and include [the] KPX’s generation costs in its analysis renders its final determination unsupported by substantial evidence.” Id. at 1378. As in the CAFC POSCO Final Determination, Commerce excluded the KPX’s costs from its analysis in reaching the Final Determination in this case, Consol. Court No. 16-00227 Page 14 explaining: [W]ith respect to the costs of the generators, including the nuclear generators, the Department did not request these costs because the costs of electricity to KEPCO are determined by the KPX. Electricity generators sell electricity to the KPX, and KEPCO purchases the electricity it distributes to its customers through the KPX. Thus, the costs for electricity are based upon the purchase price of electricity from the KPX, and this is the cost that is relevant for KEPCO’s industrial tariff schedule. Final IDM at 49. The statute provides in relevant part: If, in the course of a proceeding under this subtitle, [Commerce] discovers a practice which appears to be a countervailable subsidy, but was not included in the matters alleged in a countervailing duty petition, . . . then [Commerce] (1) shall include the practice, subsidy, or subsidy program in the proceeding if the practice, subsidy, or subsidy program appears to be a countervailable subsidy with respect to the merchandise which is the subject of the proceeding . . . . 19 U.S.C. § 1677d; see also 19 C.F.R. § 351.311. In addition to the statute, the CAFC POSCO court cited Allegheny Ludlum Corp. v. United States (“Allegheny I”), 24 CIT 452, 112 F. Supp. 2d 1141 (2000), for the proposition that “Commerce has an affirmative duty to investigate any appearance of subsidies related to the investigation that are discovered during an investigation.” 977 F.3d at 1378 (citing Allegheny I, 24 CIT at 461, 112 F. Supp. 2d at 1150). On remand in that case, the court in Allegheny Ludlum Corp. v. United States (“Allegheny II”), 25 CIT 816 (2001), upheld Commerce’s Consol. Court No. 16-00227 Page 15 determination that “while a financial contribution occurred, that contribution did not appear to be a countervailable subsidy when the record evidence was analyzed, revealing the absence of a benefit.” 25 CIT at 825. The court explained that “the plain language of the statute . . . only require[s] Commerce to investigate where there is a practice that ‘appears to be’ or ‘appears to provide’ a countervailable subsidy.” Id. at 821. The statute requires Commerce to “review the record, weighing and analyzing both negative evidence and positive evidence, to determine whether the business practice appears to be a countervailable subsidy,” but “does not force Commerce to fully investigate any subsidy.” Jiangsu Zhongji Lamination Materials Co. v. United States, 43 CIT __, __, 405 F. Supp. 3d 1317, 1342 (2019) (internal quotation marks and brackets omitted) (quoting Allegheny II, 25 CIT at 824). Nucor argues also that the Second Remand Determination is unlawful because it “treat[s] the ‘prevailing market conditions’ in Korea as coextensive with ‘the tariff classifications established by KEPCO’ and do[es] not properly expand the analysis to include additional information regarding the KPX or actual generation costs.” Nucor’s Cmts. at 11–12. Nucor contends that Commerce relied only on the Government of Korea’s responses to two questions in the Govt. of Korea Initial Questionnaire1 that addressed KEPCO’s cost of purchasing electricity 1 The two questions posed by Commerce were: Consol. Court No. 16-00227 Page 16 through the KPX but not the cost of generating electricity. Id. at 12 (citing Second Remand Determination at 17); see also Govt. of Korea Initial Questionnaire, Section II, Questions 40–41. Nucor asserts that the deficiency identified in CAFC POSCO remains because the Second Remand Determination “include[s] no additional information or analysis regarding the actual costs of generating and supplying electricity.” Nucor’s Cmts. at 13. Nucor’s assertions are inaccurate. As Defendant asserts, Commerce did not rely only on the Government of Korea’s responses to two questions in the Govt. of Korea Initial Questionnaire. See Def.’s Resp. at 9. In the Second Remand KEPCO pays its subsidiaries the generating cost when it purchases electricity at the [KPX] and that the capital and generating costs are included in the purchase price. If the price paid is not sufficient to cover all the costs including the amount of investment return, please explain the costs that are not covered and provide the additional amount that would need to be paid to cover all costs including an appropriate amount of investment return. Please make sure to also provide this additional amount in percentage terms. Govt. of Korea Initial Questionnaire, Section II, Question 40. The price of electricity from the KPX reflects an adjusted coefficient that is determined by the Cost Evaluation Committee. Please explain how the adjusted coefficient was determined; how often the adjusted coefficient is changed; and provide the adjusted coefficients that were in effect during the [period of investigation]. Govt. of Korea Initial Questionnaire, Section II, Question 41. Consol. Court No. 16-00227 Page 17 Determination, the Court observes that Commerce also cited information from KEPCO’s 2015 Form 20-F covering calendar year 2014, which was filed with the U.S. Securities and Exchange Commission and was submitted with the Govt. of Korea’s Initial Questionnaire Response. 2 Second Remand Determination at 39 & nn.139–41, 40 & nn.142 & 144, 41 & n.147 (citing Govt. of Korea’s Initial Questionnaire Resp. Ex. E-3 (“KEPCO’s 2015 Form 20-F”)). The additional information from KEPCO’s 2015 Form 20-F went beyond KEPCO’s rate-setting methodology and included the subsidiaries’ costs of generating electricity and the KPX’s costs in administering sales of electricity to KEPCO, as required by CAFC POSCO. The KPX does not generate electricity. Id. at 32 n.115 (citing Govt. of Korea’s Initial Questionnaire Response at 9). As the CAFC POSCO court noted, electricity in Korea is “generated by ‘independent power generators, community 2 Commerce also referenced Certain Hot-Rolled Steel Flat Products from the Republic of Korea: Final Results of Countervailing Duty Administrative Review, 2017 (“2017 Administrative Review of Hot-Rolled Steel”), 85 Fed. Reg. 64,122 (Dep’t of Commerce Oct. 9, 2020), in which Commerce investigated the selling of electricity to KEPCO through the KPX, “in the event that the Court wanted additional information with respect to ‘[the] KPX’s generation costs.’” Second Remand Determination at 40; see also Def.’s Resp. at 12–13. Nucor argues that no upstream subsidy allegation was made during this investigation and Commerce’s upstream subsidy determinations in subsequent administrative reviews are irrelevant here. Nucor’s Cmts. at 14–15. Because the Court concludes that evidence on this record supports Commerce’s determination, the Court does not consider the 2017 Administrative Review of Hot-Rolled Steel. Consol. Court No. 16-00227 Page 18 energy systems, and KEPCO’s six subsidiaries.’” 977 F.3d at 1373. “Commerce found [that] KEPCO, through its six subsidiaries, generates the ‘substantial majority of the electricity produced in Korea.’” Id. Therefore, it was reasonable for Commerce to use the average fuel costs of KEPCO’s electricity-generating subsidiaries as reflected in KEPCO’s 2015 Form 20-F for the costs of generating electricity. See Second Remand Determination at 39. The Court concludes that Commerce complied with CAFC POSCO in considering additional information from the record regarding the costs of generating electricity. Commerce also complied with CAFC POSCO in reviewing the record on second remand and determining, as in Allegheny II, that there was no appearance of a subsidy provided by the KPX. Commerce explained that for the purpose of determining whether a practice appears to be a countervailable subsidy that triggers its obligation under Section 1677d, Commerce considered whether the practice appeared to have the three elements of a countervailable subsidy: “(1) a financial contribution that (2) confers a benefit which (3) is specific.” Second Remand Determination at 7–8. Commerce acknowledged that the KPX is an authority that provided a financial contribution and that the Petition alleged possible specificity, but Commerce determined that there was no evidence of a benefit conferred in the pricing between the KPX and KEPCO, and therefore no appearance of a countervailable subsidy provided by the KPX that Commerce was required to Consol. Court No. 16-00227 Page 19 include in the proceeding. Id. at 8. Commerce determined that the KPX’s prices paid by KEPCO exceeded the KPX’s full cost, including the cost paid by the KPX to the generators to cover the cost of generating electricity, and therefore did not constitute a benefit under 19 U.S.C. § 1677(5)(B). Id. at 18–19; see also Def.’s Resp. at 10. The Court concludes that Commerce complied with CAFC POSCO in analyzing the KPX’s costs and answering, in the negative, the CAFC POSCO court’s question of “whether a benefit was conferred by way of the price charged by [the] KPX to KEPCO.” See CAFC POSCO, 977 F.3d at 1377. Nucor argues that Commerce’s determination fails because it considered the profitability of KEPCO and KEPCO’s generation subsidiaries only “in the aggregate,” in other words, based on “all sales to all users” and not specifically with respect to sales to the respondents. Nucor’s Cmts. at 15–16. As Defendant argues, however, Commerce did not base its determination solely on KEPCO’s overall profitability as Nucor asserts. See Def.’s Resp. at 9–10. As discussed above, Commerce determined that KEPCO based the rates for each electricity classification on its overall costs as calculated and distributed to customers based on contract demand, voltage, hours of use, time of day (off-peak, mid-peak, onpeak), season, and number of consumers for each classification of electricity. See supra pp. 17–18. Commerce’s consideration of KEPCO’s cost recovery in the context of these factors is consistent with the statute’s instruction for Commerce to Consol. Court No. 16-00227 Page 20 determine the adequacy of remuneration “in relation to prevailing market conditions,” including “price, quality, availability, marketability, transportation, and other conditions of purchase or sale.” See 19 U.S.C. § 1677(5)(E). Nucor contends that “KEPCO’s pricing structure creates de facto crosssubsidization, through which the majority of society . . . pays the highest government-assigned prices in order to cover the fixed costs that are excluded from the [low] government-assigned prices paid to generators supplying electricity to off-peak, industrial consumers like the mandatory respondents.” Nucor’s Cmts. at 16–17 (citation and internal quotation marks omitted). But on the contrary, the mandatory respondents purchased electricity at all three rates, “Off-Peak,” “MidPeak,” and “On-Peak,” not only, or even overwhelmingly, at the lowest off-peak rates. See Certain Hot-Rolled Steel Flat Products from Korea, Case No. C-580884: [POSCO’s] Initial Questionnaire Resp. (Nov. 2, 2015), CR 41–84, Ex. A-2 (“POSCO’s Electricity Template”); Certain Hot-Rolled Steel Flat Products from Korea, Case No. C-580-884: [Hyundai Steel’s] Section III Initial Questionnaire Resp. (Nov. 6, 2015), CR 193–237, Ex. A-1 (“Hyundai Steel’s Electricity Template”). As Commerce noted in the Final IDM, “[t]he fact [that] [the] respondents operate their production facilities 24 hours a day and consume large amounts of electricity during the evening hours is more evidence of supply and demand than any [benefit].” Final IDM at 44. And it would seem that setting Consol. Court No. 16-00227 Page 21 lower rates for lower demand during off-peak hours is consistent with market principles rather than being a hallmark of “de facto cross-subsidization” as asserted by Nucor. See Blum v. Stenson, 465 U.S. 886, 895 n.11 (1984) (“Market prices of commodities and most services are determined by supply and demand.”). Comparing the lowest monthly off-peak rate paid by a mandatory respondent to the annual average cost for the lowest cost generator, Nucor asserts that the record shows that the off-peak rates paid by the respondents do not cover costs. See Nucor’s Cmts. at 17 (citing POSCO’s Electricity Template; Hyundai Steel’s Electricity Template; Second Remand Determination at 39 n.140). Nucor’s mismatched comparison of the lowest variable monthly off-peak rate paid by a mandatory respondent to the annual average cost for the lowest cost generator does not undermine the record evidence that supports Commerce’s determination. That the lowest monthly rate was lower than the annual average cost provides no information to confirm or discredit the generator’s cost recovery that month or that year. Commerce also complied with CAFC POSCO in considering the costs of acquiring electricity through the electricity supply chain. By Korean law, “[a]ll electricity generated in Korea, including that of the private generators, must be sold to KEPCO,” through the KPX. CAFC POSCO, 977 F.3d at 1373; Second Remand Determination at 32 n.115 (citing Govt. of Korea’s Initial Questionnaire Consol. Court No. 16-00227 Page 22 Response at 9). The KPX, “a wholesale market,” “which is wholly owned by KEPCO and its six subsidiaries,” administers “all sales of electricity in Korea.” CAFC POSCO, 977 F.3d at 1373. “[E]lectricity generators ‘sell’ electricity to [the] KPX and then KEPCO ‘purchases’ that electricity from [the] KPX . . . .” Second Remand Determination at 38 n.136 (citing Final IDM at 49). “KEPCO is a state-owned entity and the sole provider of electricity in Korea.” CAFC POSCO, 977 F.3d at 1378. “KEPCO purchases electricity from the KPX and transmits and distributes to the customers.” Second Remand Determination at 32 n.115 (citing Govt. of Korea’s Initial Questionnaire Response at 9). For KEPCO’s subsidiaries, Commerce compared each subsidiary’s average price per kilowatt hour (the price paid to the subsidiary by the KPX) to its average fuel cost per kilowatt hour, as disclosed in KEPCO’s 2015 Form 20-F, and determined that “it is readily apparent that the KPX unit price more than covered the fuel costs for each of these generators.” See id. at 39 & n.140. Commerce also noted that all six subsidiaries were profitable in 2014 and five subsidiaries distributed cash dividends. Id. at 40. For the KPX, Commerce explained that “the only revenue permitted is membership fees, commission on electricity utility transactions and other revenue proscribed by [the Ministry of Trade, Industry and Energy] and its financial statements establish revenue from commissions more than covered its operating Consol. Court No. 16-00227 Page 23 expenses.” Id. Commerce determined, based on KEPCO’s 2015 Form 20-F, that the KPX recovered costs during the period of investigation. Id. For KEPCO, the CAFC POSCO court noted that “[w]hile KEPCO and other government entities establish the ultimate prices to end users, the basis of these prices is the cost of KEPCO’s purchases from the KPX,” CAFC POSCO, 977 F.3d at 1373, “and [the] KPX’s pricing accounts for upwards of 90% of KEPCO’s total cost,” id. at 1377 (citations omitted). Commerce reviewed KEPCO’s industrial tariff electricity schedule, which designated rates based on contract demand, voltage, hours of use, time of day (off-peak, mid-peak, on-peak), and season. Second Remand Determination at 12–13 (citing Final Determination at 44–50; Govt. of Korea’s Initial Questionnaire Response Ex. E-13 (“KEPCO’s Electricity Schedule”)). Commerce explained that it calculated the “cost for each electricity classification” by: “(1) distributing the overall cost according to the stages of providing electricity (generation, transmission, distribution and sales); (2) dividing each cost into fixed cost, variable cost, and the consumer management fee; and (3) then calculating the cost by applying the electricity load level, peak level, and the patterns of consuming electricity.” Id. at 13. Commerce reviewed the Govt. of Korea’s Initial Questionnaire Response, which explained that the industrial tariff classifications were segregated by contract demand, either 4–300kW or more than 300kW, and by voltage, Low Voltage (220–380V), High Voltage (A) (3,300– Consol. Court No. 16-00227 Page 24 66,000V), High Voltage (B) (154,000V), or High Voltage (C) (345,000V or higher). Id. at 12–13 (citing KEPCO’s Electricity Schedule). The higher the contract demand and the higher the voltage, the lower the industrial rate. Id. at 13. Commerce determined that, in addition to “the electricity load level, the usage pattern of electricity, and the volume of electricity consumed,” KEPCO distributed costs “according to the number of consumers for each classification of electricity.” Id. (citing Final IDM at 49). Commerce repeated its determination and explanation from the Final Determination that KEPCO developed its electricity schedule based on its costs. Id. Commerce determined that the method used to set KEPCO’s industrial tariff schedule was based on price, marketability, transportation, and other conditions of purchase or sale, which constituted prevailing market conditions within the meaning of Section 1677(5)(E)(iv). Id. at 12. Commerce then considered whether the tariff classification rate charged to the respondents covered KEPCO’s costs and whether the respondents were assigned to the appropriate tariff classification. Id. at 12, 15–17. Commerce concluded again that for the period of investigation, KEPCO more than fully covered its cost for the industrial tariff applicable to the respondents. Id. at 13–14 (citing Final IDM at 49). Commerce determined based on KEPCO’s 2015 Form 20-F that “KEPCO, as a consolidated entity, was profitable and its revenue was positive in transmission, distribution and power generation (nuclear and non- Consol. Court No. 16-00227 Page 25 nuclear).” Id. at 39. Commerce determined that KEPCO “not only [recovered] the cost of production, but also [secured] a return on investment.” Id. at 40. Commerce’s determinations that the subsidiaries, the KPX, and KEPCO recovered their costs and secured returns on investment was supported by KEPCO’s 2015 Form 20-F. See Second Remand Determination at 12–13 (citing KEPCO’s Electricity Schedule), 39 & n.140 (citing KEPCO’s 2015 Form 20-F), 40. The Court concludes that Commerce’s determination that the provision of electricity to the respondents was not for less than adequate remuneration is supported by substantial evidence and complies with CAFC POSCO. CONCLUSION For the aforementioned reasons, the Court sustains Commerce’s Second Remand Determination. Judgment will be entered accordingly. /s/ Jennifer Choe-Groves Jennifer Choe-Groves, Judge Dated: June 13, 2022 New York, New York

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.